Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 

Permits

Parcel Number - 20564072C
Date - 12/23/2024 12:36 p.m.
Total Number Of Permits - (9)
Permit Permit Status Entered Date Expired Date Unit Type Description
T09BU00278 Final 02/25/2009 11/11/2019 GRADSWPP GRADING & SWPP PART A-1
T09BU00279 Expired 02/25/2009 10/11/2015 GRADSWPP GRADING/SWPPP:MOUNTAIN VAIL EST.PRV.GD & DRAINAGE
T09BU00280 Withdrwn 02/25/2009 05/25/2013 GRADSWPP GRADING & SWPP PART B
T09BU00281 Expired 02/25/2009 10/19/2020 GRADSWPP GRADING & SWPP PART C
T09BU00282 Issued 02/25/2009 07/01/2014 GRADSWPP GRADING & SWPP PART D
T09BU00283 Expired 02/25/2009 07/01/2014 GRADSWPP GRADING & SWPP PART E
T09BU00284 Issued 02/25/2009 05/25/2013 GRADSWPP GRADING & SWPP PART F
T09BU00285 Expired 02/25/2009 05/25/2013 GRADSWPP GRADING & SWPP PART G
T09BU00539 Final 04/14/2009 11/12/2011 GRADSWPP GRADING:

Plans

Parcel Number - 20564072C
Date - 12/23/2024 12:36 p.m.
Total Number Of Plans - 12
Plan Number Plan Status Application Date Expired Date Unit Type Description
S07-110 Approved 07/12/2007 04/23/2020 Land Division MOUNTAIN VAIL ESTATES
S08-135 Approved 12/01/2008 02/22/2020 Land Division MOUNTAIN VAIL ESTATES,PHASE II
T09PI00006 Approved 04/06/2009 10/06/2009 Private Improvement Agreement MT. VAIL ESTATES PART G LOTS 339-345 & 385-501
T09PI00007 Approved 04/06/2009 10/06/2009 Private Improvement Agreement Mountain Vail Estates, Part F, Lots 323-338 & Lots 346-384
T09PI00011 Approved 04/06/2009 10/06/2009 Private Improvement Agreement Mountain Vail Estates, Part B, Lots 136 thru 183
C9-06-16 Closed 06/05/2006 N/A REZONING PROCEDURES Proposal is for a single-family detached residential cluster project of 580 homes on 135 acres to be developed in conjunction with C9-06-15.
S08-084 Expired 07/02/2008 09/02/2009 LOT SPLIT
T09PI00004 Final 04/06/2009 N/A PAVING MOUNTAIN VAIL ESTATES - MARY ANN CLEVELAND WAY & ATTERBURY WASH WAY (NORTH)
T09PI00005 Final 04/06/2009 N/A PAVING & SEWER MOUNTAIN VAIL ESTATES - MARY ANN CLEVELAND WAY & ATTERBURY WASH WAY (SOUTH)
T09PI00008 Final 04/06/2009 12/08/2015 PAVING & SEWER MOUNTAIN VAIL ESTATES PART E LOTS 243-286 Offsite Improvement plans for the installation, back-filling, grading from property line to property line, and all clean-up necessary to install those improvements as shown on City of Tucson approved plan I-2009-013 (all in accordance with Pima County/City of Tucson Standards and Specifications and Details). Construction inspection will be performed by the City of Tucson Department of Transportation in accordance with City of Tucson Standards and Specifications. Any required special inspection shall be performed by the developer's engineer of record. The developer/contractor shall be responsible for the backfill of all wet and dry utility trenches per Pima County/City of Tucson Standards and Specifications for Public Improvements. Compaction and material testing reports and construction surveillance notes pertaining to the backfilling of the utility trenches must be submitted to the City of Tucson Department of Transportation, Permits and Codes Section, for review prior to start of construction.
T09PI00009 Final 04/06/2009 N/A PAVING & SEWER Mountain Vail Estates, Part D, Lots 216-242 & Lots
T09PI00010 Final 04/06/2009 N/A PAVING & SEWER MOUNTAIN VAIL ESTATES - PART C, LOTS 184 THRU 215