Permit Number: T09BU00282
Parcel: 20564072C

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T09BU00282
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/29/2010 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 03/30/2010

Mountain Vail Estates, Part D, Lots 216 thru 242 and 287 thru 322, C.A. "B" Grading Plan Comments:

1- The Geotechnical Report shall recommend the required setback from existing/proposed slopes whether they are created by a cut or a fill. Verify compliance with the Soils Report recommendation.
2- Provide construction easement to work on the adjacent property near Lots 272 thru 286 wherever applicable. Clarify how the easements will be provided.

SWPPP Comments:

1. Show on the SWPPP exhibit possible locations for on-site waste storage or receptacles, borrow areas, or other supporting activities (Part III.C.3.e).

If you have any questions, Laith Alshami may be reached at 837-4933 or Laith.Alshami@tucsonaz.gov
03/30/2010 STEVE SHIELDS ZONING REVIEW Denied 03/30/10

Planning and Development Services Department
Zoning Review Section

Steve Shields
Lead Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan at this time.

2. While zoning acknowledges that the grading plan is in substantial zoning compliance as it relates to the Zoning review purview, with the approved version of the tentative plat, the grading plan cannot be approved at this time. Prior to Zoning approval the Engineering and Landscape Sections must approve the grading plan.

3. Provide some type of barrier (bollards or vertical curb) at the east end of Rabbit Run Way to prevent vehicles from accessing un-developed areas.

4. Zoning is willing to review and approve the grading plan over the counter once the engineering and landscape sections have approve this plan.

Please call me to set up an appointment for a counter review and approval of the grading plan.
04/05/2010 ANDREW CONNOR NPPO REVIEW Denied Ensure that all Engineering comments and concerns are addressed prior NPP / Landscape approval stamp.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/07/2010 CPIERCE1 OUT TO CUSTOMER Completed
04/07/2010 SUE REEVES REJECT SHELF Completed