Permit Number: T09BU00278
Parcel: 20564072C

Review Status: Completed

Review Details: RESUBMITTAL - GRADING ALL

Permit Number - T09BU00278
Review Name: RESUBMITTAL - GRADING ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/26/2010 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 03/29/2010

Mountain Vail Estates, Part A, Lots 1 thru 135 Grading Plan Comments:

1- The Geotechnical Report shall recommend the required setback from existing/proposed slopes whether they are created by a cut or a fill. Verify compliance with the Soils Report recommendation.
2- Provide the sediment trap elevations on Details #2/2, 4/2 1/5, 2/5 and 3/5.
3- It is not clear why Detail 5/5 was added. Clarify the need for all three details (i.e. 1 /4, 2/4 and 5/5.
4- Show a typical cross section detail for the proposed retaining wall between lots 64-66 and between Lot 82 and Basin B-1. The response to this comment is not clear.
5- Clarify if the spillway in Detail 2/6 should have a slope. Detail 2/6 does not show a slope.
6- Proposed streets profiles sheets were not included in the previous submittal. It does not appear that the new 12 sheets review fee was paid. The fee must be paid before the new sheets can be reviewed.
7- Clarify where Keynote #10 callout is located on Sheet 5 of 7. The response does not appear to answer this comment.
8- Call out any bollards at the end of Creosote Range Drive, north of Basin B-4. The answer to this comment states that Creosote Range Drive is access to locale residence. Clarify how this section of the is used as access.

SWPPP Comments:

1. Show possible locations for stockpiling and waste storage areas on the exhibit.

If you have any questions, Laith Alshami may be reached at 837-4933 or Laith.Alshami@tucsonaz.gov
03/30/2010 DAVID RIVERA ZONING REVIEW Denied 03/30/2010

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan at this time.

2. While zoning acknowledges that the grading plan is in substantial zoning compliance as it relates to the Zoning review purview, with the approved version of the tentative plat, the grading plan cannot be approved at this time. There are some areas on the grading plan that do not match the development plan. Please address the zoning review comments and revise the grading plan as required.

(Engineering and Landscape Sections must approve the grading plan prior to zoning aspproval.)

3. Not addressed as requested.

Previous Comment 4. Draw and label the 10' non-motorized trail esm't on sheet 7.

4. Please ensure that the grading plan matches the CDRC approved and stamped tentative plat. Zoning will re-review the grading plan on the next submittal to ensure compliance with the CDRC approved and stamped tentative plat.

6. Please be consistent with the submittal of the overall master grading plan cover sheet. This is under the assumption that the grading is being phased.

Additional comments could be forthcoming.
04/05/2010 ANDREW CONNOR NPPO REVIEW Denied Ensure that all Engineering comments and concerns are addressed prior to Landscape / NPPO approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
04/07/2010 CPIERCE1 OUT TO CUSTOMER Completed
04/07/2010 SUE REEVES REJECT SHELF Completed