Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: T08PI00010
Parcel: Unknown

Address:
5145 S 1ST AV

Review Status: Completed

Review Details: PIA SUBMITTAL

Plan Number - T08PI00010
Review Name: PIA SUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/06/2008 SMONTIE1 UTILITY CLEARANCES COT STREETS DIVISION Denied Please submit utility clearance letters.
03/06/2008 SMONTIE1 UTILITY CLEARANCES COT WATER NEW DEVELOPMENT Denied Please submit utility clearance letters.
03/06/2008 SMONTIE1 UTILITY CLEARANCES PC WASTEWATER MGMT Denied Please submit utility clearance letters.
03/06/2008 SMONTIE1 UTILITY CLEARANCES QUEST COMMUNICATION Denied Please submit utility clearance letters.
03/06/2008 SMONTIE1 UTILITY CLEARANCES TUCSON ELECTRIC POWER CO Denied Please submit utility clearance letters.
03/06/2008 SMONTIE1 UTILITY CLEARANCES COX COMMUNICATION Denied Please submit utility clearance letters.
03/06/2008 SMONTIE1 UTILITY CLEARANCES SOUTHWEST GAS CORP Denied Please submit utility clearance letters.
03/06/2008 SMONTIE1 UTILITY CLEARANCES EL PASO NATURAL GAS Denied Please submit utility clearance letters.
03/06/2008 SMONTIE1 UTILITY CLEARANCES KINDER MORGAN ENERGY Denied Please submit utility clearance letters.
03/18/2008 GARY WITTWER DOT LANDSCAPE REVIEW Denied 1. Please submit a copy of your approved Native Plant Preservation Plan. I am looking to see if you have inventoried the plants that will be impacted by the sidewalk along Park.
2. Please submit a copy of your approved Landscape and Irrigation plans for the common areas. I am looking to see if you have any private irrigation lines running under public roadways. This is not allowed except with a legal easement on the temp and final plat.
03/26/2008 JOSE ORTIZ DOT TRAFFIC REVIEW Denied March 26, 2008
ACTIVITY NUMBER: T08PI00010
PROJECT NAME: Sunnyside Pointe
PROJECT ADDRESS: 5145 S 1st Avenue
PROJECT REVIEWER: Jose E. Ortiz PE, Traffic Engineer

Resubmittal Required: Traffic Engineering does not recommend approval of the PIA Plan; therefore a revised PIA Plan is required for re-submittal.

The following items must be revised or added to the plan.

1. Include a response letter with the next submittal that states how all comments have been addressed.

2. See redlines on the submitted drawings and address the additional redline comments. During the next submittal please re-submit the roll of redlines for back checking purposes.

3. Install R1-1 (Stop Sign) with street names at the proposed roadway entering this development off Park Avenue per PCDOT & TDOT Signing Manual (2002) Chap 5-11, 5-12, and Chap 9-2. See redlines for additional stop sign locations.

4. Install a W14-2a (No Outlet) plaque beneath the street name signs at the cul-de-sacs.

5. Install R2-1 (25MPH Speed Limit Sign) at the proposed roadway entering this development off of Park Avenue per PCDOT & TDOT Signing Manual (2002) Chap 9-10.

6. Parking is not allowed in cul-de-sacs from PRC to PRC. So indicate on the plans by showing no parking signs on the plans. (DS 3-01.0 fig 20) (straight cul-de-sac)

7. Provide a detail of the No Parking sign to be used. If needed a drawing of the detail is attached to the red line plan set.

8. Place the PIA and CDRC Case number on the cover sheet.

9. Add the following Signing General Notes 5(a) & 5(b) per PCDOT & TDOT Signing Manual (2002) (Chapter 1, Sheet 12) to the Plans.

10. Add the following Pavement Marking/Striping General Notes to the Plans:

'ALL STREET STRIPING & SIGNAGE TO BE COORDINATED WITH C.O.T. TRAFFIC ENGINEERING CALL 791-4259 A MINIMUM OF 48 HOURS PRIOR TO THE INSTALLATION OR REMOVAL OF ANY SIGNAGE OR STRIPING. ALL REQUIRED STRIPING AND SIGNAGE WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. NEW STRIPING TO BE THERMOPLASTIC MATERIAL. USE 2" SQUARE-TUBE POST AND SQUARE TUBE POST FOUNDATIONS FOR SIGNING. BARRICADE PLAN MUST BE SUBMITTED TO THE CITY OF TUCSON TRAFFIC ENGINEERING FOR APPROVAL 48 HOURS IN ADVANCE OF ANY WORK IN PUBLIC RIGHT OF WAY.'

'ALL NON-SIGNALIZED INTERSECTION STREET NAMES MUST HAVE E-W BLOCK NUMBER ADDRESSES FOR E-W ROADWAYS AND N-S BLOCK NUMBER ADDRESSES FOR N-S ROADWAYS.'

'THE CITY SHALL NOT BE LIABLE FOR ANY ERRORS AND/OR OMISSIONS ON THESE PLANS. ITEMS NOT MEETING CITY STANDARDS SHALL BE REPAIRED/REPLACED BY THE DEVELOPER/CONTRACTOR AND AT NO COST TO THE CITY.'



If you have any questions, I can be reached at 791-4259 x76730 or Jose.Ortiz@tucsonaz.gov
03/28/2008 LANCE PETERSON DOT STREET MAINTENANCE REVIEW Denied We have reviewed this plan and have the following comments:

1. Please provide a Streets and Traffic Maintenance signature block.
2. Sheet 2 - Is the channel coming from Common Area B to be maintained by the City of the Home Owners Association?
3 Sheet 12 - Detail J - Since the scupper seems to drain to the street what is the purpose of the rip rap? Also, if you are planning on the rip rap, what is the rock size and pad thickness? Please include a filter fabric.
4. Will there be any landscaping installed with this project? If so, please submit the landscape plan to Paul Rosenboon at 4004 S. Park Avenue, Bld#2 for review.
5. All work in the right of way needs to be coordinated with Paul Rosenboom to prevent damage to existing landscaping and irrigation.
03/28/2008 RICHARD LEIGH DOT ENGINEERING REVIEW Denied March 18, 2008

SUBJECT: Sunnyside Pointe , PIA T08PI0010. I-2008-011

FROM: Richard Leigh, DOT, Permits and Codes Section

RESUBMITTAL REQUIRED: Permits and Codes Section has reviewed the PIA Plan and does not recommend approval of the PIA Plan at this time. The following comments need to be addressed in the next submittal.

1. Include the plan number "I-2008-011" in title block of each sheet.

2. Include Development Services Department PIA activity (T08000010) and subdivision number on cover sheet.

3. Include the subdivision's recordation information (Book & Page) on cover sheet.

4. Include all linework used in plan set in the line legend.

5. Use current COT, DOT , PIA title block, see attached.

6. Remove traffic engineer signature line.

7. Provide a dimensioned detail of each type of curb access ramp proposed in the plan set.

8. Show existing improvements and include all details for any proposed improvements on 1st Avenue. Will curb and sidewalks be provided?

9. Include all details for the improvements within the Nebraska Wash. Show complete details for the storm drains and outlets (scour/bank protection). Are flap gates warrented? Manholes will be required within the 1st Avenue right-of-way for maintenance and storm drain locating.

10. Provide roadway hydraulic capacity analysis.

11. Lighten shading used for new pavement.

12. Provide complete details for the proposed right turn lane on Park Avenue. Include plan and profile and pavement structural details.

13. Indicate that all abandoned curb openings along Park Avenue will be closed.

14. Roadway cross section call-outs do not refer to the correct cross section. Check and revise as necessary.

15. Place additional curb access ramps as indicated on redlined plan set.

16. Label all elevations in the profile views.

17. Label and delineate roadway cross slope transitions in plan views.

18. Label and provide complete details for the proposed catch basin located at Sta. +/- 1+65, LT (Equality Lane) and Sta. +/- 2+89, LT (Hammer Place).

19. Provide a modified detail for the proposed catch basin situated on a radius and modified to accommodate 3 30" RCPs at Sta. +/- 12+28, LT ( Hammer Place).

20. Verify labeling of the roadway cross sections provided on sheet 12, see redlines.

21. Indicate the cross slopes in roadway cross sections.

22. The minimum sidewalk width for residential streets is five (5) feet wide.

23. Provide additional details for the proposed catch basins. Provide curb transition details, show modifications to catch basin to accommodate 30" RCPs, provide pipe inverts and slopes and indicate a minimum 2' buffer between the right-of-way line and the top of slope of the proposed basins.

24. Show all private storm drain pipes located within the public rights-of-way. A private drainage easement will have to be obtained for the proposed storm drain pipes located within the public rights-of-way. Additionally, manholes will have to be provided for locating purposes.

Refer to redline plans for additional comments and comment details.

If you have any questions, I can be reached at 837-6647 or Richard.Leigh@tucsoz.gov
03/31/2008 SMONTIE1 PIA COORDINATOR CUSTOMER CALLED Completed
03/31/2008 SMONTIE1 PIA COORDINATOR OUT TO CUSTOMER Completed