Permit Number: T08OT00847
Parcel: 133040030

Review Status: Completed

Review Details: FLOODPLAIN

Permit Number - T08OT00847
Review Name: FLOODPLAIN
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/19/2008 LOREN MAKUS ENGINEERING REVIEW Denied June 19, 2008
T08BU00699/T08OT00847
Desert Christian School Grading and Floodplain Use Permit Review
First Review
Loren Makus, EIT

1. The grading plan cannot be approved until the Environmental Resource Zone submittal and site plan have been approved. Additional comments may be forthcoming on future reviews depending on any changes resulting from the reviews of the ERZ and site plans.
2. Revise the SWPPP and drainage report to correctly identify the current or most recent status of the project site. The two reports indicate the site is undeveloped. However, aerial photography indicates that the site has been previously developed. Show the features of the previous development as existing conditions on the grading plan.
3. Revise the SWPPP to indicate the percentage of the site that is impervious before and after construction. (Part III.C.2.d)
4. Discuss in the SWPPP and in the drainage report how the discharge from the west channel will be rendered non-erosive between the end of the constructed channel and the main channel of the Tanque Verde Wash.
5. Describe the planned phasing or sequencing of land disturbance activities. The amount of open/disturbed dirt left open at one time should be minimized where possible. (Part III.C.2.b)
6. Indicate the percentage of the site that is impervious before and after construction. (Part III.C.2.d)
7. Clearly indicate on the site map the areas that will not be disturbed by construction activities. (Part III.C.3.b)
8. Identify the Tanque Verde Wash on the site map. (Part III.C.3.f)
9. Clearly identify the locations where stormwater discharges to the Tanque Verde Wash. (Part III.C.3.g)

Final Status

Task End Date Reviewer's Name Type of Review Description
06/23/2008 VFLORES1 OUT TO CUSTOMER Completed