Permit Review Detail
Review Status: Completed
Review Details: ELECTRICAL
Permit Number - T08EL00828
Review Name: ELECTRICAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/09/2008 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T08EL00828 5/9/08 1. For single dwelling calculation, the heating/ac load must be added after the 40% demand factor is taken. NEC 220.82. 2. Four units, not 8. 3. For service load calculation, the house panel must be added after the demand factor is taken. NEC 220.84. 4. For service calculation, the demand factor is 0.45, not 0.43. NEC 220.84. 5. Calculate neutral current per NEC 220.61, and show calculations. |