Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
11/26/2008 | MARTIN BROWN | FIRE | REVIEW | Approved | |
12/01/2008 | STEVE SHIELDS | ZONING | REVIEW | Denied | DSD TRANSMITTAL FROM: Steve Shields Lead Planner PROJECT: T08CM03769 Cell Tower (1st Review) TRANSMITTAL DATE: December 1, 2008 1. The Cell Tower plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. The plan must be approved and stamped by the Special Exception Section prior to approval by Zoning. 3. Zoning will re-review the Cell Tower plan on the next submittal to insure compliance with the approved Special Exception process. Additional comments may be forthcoming. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C:\planning\celltower\t08cm03769.doc |
12/01/2008 | Michael Wyneken | PLANNING-CITY HALL | REVIEW | Denied | Please address the following, which are required under the Zoning Examiner's Decision Letter: Show maximum monopole diameter (max. = 18") ZE condition 8. Verify block width in CMU wall to be minimum 6" (ZE condition 14). Provide complete landscape plan per ZE condition 15. |
12/02/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. 1/8" LETTERING IS REQUIRED ON ALL DRAWINGS UNLESS A WRITTEN APPEAL FOR 3/32" LETTERING IS APPROVED BY THE BUILDING OFFICIAL, JESSIE SANDERS. THIS APPROVED APPEAL MUST ACCOMPANY THE DRAWINGS SUBMITTED FOR CHECKING. |
12/04/2008 | JAY HOGAN | COMMUNICATIONS | REVIEW | Approved | |
12/15/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | Project: 2699 S Pantano Rd T08CM03769 AT&T Cell Site The electrical plans for this project have been denied due to the following items: 1. Electrical plans to be sealed and dated by EE. 2. Provide fault current values at main disconnect and at power cabinet. 3. Determine if isolation transformer required and it is provide information on plan for it. RayT Majuta Electrical Plan Check DSD City of Tucson 520-837-4988 12-16-08 |
12/15/2008 | BIANCA RAMIREZ | ENGINEERING | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/08/2009 | THAUSER1 | OUT TO CUSTOMER | Completed |
01/08/2009 | GERARDO BONILLA | REJECT SHELF | Completed |