Permit Number: T08CM03225
Parcel: 11501148E

Address:
2381 N 4TH AV

Review Status: Completed

Review Details: RESUBMITTAL - SITE ALL

Permit Number - T08CM03225
Review Name: RESUBMITTAL - SITE ALL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/02/2009 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Comment not resolved. Tucson Water limits a 5/8" meter to a maximum demand of 10 GPM. The calculations on sheet C-4 indicate that the anticipated water demand will be 18 GPM. Contact Tucson Water for permission to use 5/8" meters for the three units. Reference: Sections 610.2 and 610.12, UPC 2006.
12/04/2008 DAVE MANN FIRE REVIEW Approved
12/04/2008 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: 4th & Sahuaro Residence
T08CM03225
Site Plan (3rd Review)

TRANSMITTAL DATE: December 4, 2008

COMMENTS: Please resubmit revised drawings and a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. This site plan was reviewed for compliance with the City of Tucson Development Standards (D.S.) and Land Use Code (LUC) for full code compliance for a commercial site.

2. Prior to approval of this site plan by Zoning the lot split/subdivision issues must be resolved for this parcel and the parcels adjacent to the north. Provide written documentation for the approval of the above issues.

3. An approved Development Standards Modification Request (DSMR) is required prior to approval of the site plan. Once/if the DSMR is approved provide on the site plan; DSMR Number, Date of Approval, and Any Conditions of Approval. This comment was not addressed. Provide a pedestrian circulation path/accessible route between Unit 2 & 3. This pedestrian circulation path/accessible route must be provided on site. D.S.2-02.2.1.A.12 Per D.S. 2-08.3.1 within all development, a continuous pedestrian circulation path/accessible route is required. This path must connect all public access areas of the development and the pedestrian circulation path located in any adjacent streets. The areas within the development which must be connected include, but are not limited to, all buildings. This said provide on site a continuous pedestrian circulation path/accessible route that connects all buildings.

4. D.S.2-02.2.1.A.7 Based on the wall height shown under Keynote 5, 23'-10", and LUC Section 3.2.6.5.B, the required 4th Avenue street perimeter yard for Unit #1 is 23'-10" measured from the back of curb. The 22'-8" setback shown does not meet this requirement.

5. Additional comments may be forth coming depending on how each comment has been addressed.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

C:\planning\site\t08cm03225-3rd.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents.
12/09/2008 ANDREW CONNOR LANDSCAPE REVIEW Denied 1. Include with re-submittal DSMR approval documentation. Indicate on the lower right hand corner of the site plan, the case number, date of approval, and any conditions imposed.

2. Ensure that all changes to the site plan are reflected on the landscape plan.
12/19/2008 BIANCA RAMIREZ ENGINEERING REVIEW Denied To: W.G. Gasser DATE: December 19, 2008
3102 E. Seneca Street
Tucson, Arizona 85716

SUBJECT: 4th and Sahuaro Res., 2381 N. 4th Ave.
Site plan T08CM03225 (Second Review)
T14S, R13E, Section 01

RESUBMITTAL REQUIRED: Site Plan and Drainage Statement.

The Site Plan (SP) and Drainage Statement (DS) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Site Plan:

1. Please include a response letter to the comments along with the corrected copies of the SP.
2. See comments by Ron Brown
3. Label existing and future sight visibility triangles per D.S. 2-02.2.1.10. Label dimensions of SVT's.
Response: SVT From Sahauro along 4th Ave should be 180'.
4. Complied
5. Complied
6. Not required.
7. Complied
9. Complied
10. Complied
11. Complied
12. Complied.
13. Complied
14. Complied
15. Complied
16. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
17. Complied
18. Complied
19. Complied
20. Complied
21. Complied
22. Driveway should meet be constructed per Standard Detail for Driveway Apron. Ensure that driveway design meets the minimum requirements outlined on standard detail.


If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov

Bianca Ramirez, CFM
Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4928 office
(520) 879-8010 fax
C:/2381 N. 4th Ave site.doc

Final Status

Task End Date Reviewer's Name Type of Review Description
01/06/2009 CINDY AGUILAR OUT TO CUSTOMER Completed
01/06/2009 SUE REEVES REJECT SHELF Completed