Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Permit Number - T08CM00726
Review Name: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/04/2008 | JOHN WILLIAMS | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Passed | |
| 03/05/2008 | ERIC NEWCOMB | BUILDING-COMMERCIAL | REVIEW | Denied | 1. SHEET A-1: PROJECT DATA: REFERENCE 2006 IBC. 2. SHEET A-1: PROJECT DATA: VERIFY FLAGSTAFF BUILDING CODE AMENDMENTS. 3. SHEET S-1: PROVIDE STRUCTURAL CALCULATIONS FOR STEEL LINTEL OVER NEW OPENING. 4. SHEET A-2: SECTION 5: REFER TO IBC 3403.2.3.2(3) AND 1607.13 FOR BRACING TOP/BOTTOM OF MASONRY WALL. PROVIDE STRUCTURAL CALCULATIONS. 5. SHEET S-1: SECTION 1: SIZE OF TOP PLATE ON STEEL LINTEL BEAM AND CONNECTION TO BEAM. 6. SHEET S-1: SECTION 2: VERIFY MASONRY WALL DESIGN. SUBMIT CALCULATIONS AND INDICATE REINFORCING ON SECTION. 7. SHEET S-1:SECTION 1: SHEET A-2: SECTION 6: VERIFY NEW WALL OPENING LOCATION. SHEET A-2 INDICATES TOP OF OPENING LOCATED AT BOTTOM OF EXISTING CONCRETE BEAM. THIS WILL NOT WORK WITH STRUCTURAL SECTION. 8. PROVIDE CALCULATIONS AND DETAILS FOR NEW MECHANICAL UNIT ON EXISTING ROOF. |
| 03/05/2008 | DAVE MANN | FIRE | REVIEW | Denied | Provide the correct codes for the construction of this project. Sheet A-1 calls for the Flagstaff codes for Tucson City Hall. Justify the use of natural gas for the generator. See NFPA 70-2005, Sec. 701.11 B 3. |
| 03/07/2008 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Denied | See Detailed list with plans |
| 03/12/2008 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. A permanently legible imprint of the registrant's seal and signature shall appear on each sheet of drawings and on either the cover, title, index page, or first sheet of each set of project specifications. Reference Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304. 2. Clarify the design of the water expansion tank shown in detail 3/M1; a compression tank is shown on the detail but a diaphragm-type expansion tank is specified. Reference: Section 304.1, IMC 2006. 3. Clarify where the partial roof plan occurs (3/A-1) and show how the mechanical equipment (e.g. radiator, compression tank, etc.) is to be mounted and accessed. Reference: Sections 303.1, 304.10, 305, and 306.5, IMC 2006. 4. Provide a detail showing the location of the two required automatic safety shutoff valves along with the manual leak test valves required for proving the full closure of the two safety shutoff valves. Reference: Sections 5.2 and 5.4.3, NFPA 37-2006. 5. Show the location of the termination of the vent to the outside for the gas pressure regulator. Reference: Section 5.3.1, NFPA 37-2006. 6. Provide a drain for the low point of the exhaust system. Reference: Section 8.1.5, NFPA 37-2006. 7. Clarify the location of EF-1and show how it is to be mounted. Reference: Section 106.3.1, IMC 2006. 8. Coordinate how SF-1 is mounted with the architect and comply with the manufacturer's recommendations for fan installation. Reference: Section 304.1, IMC 2006. 9. Provide manufacturer's operating data and installation information for the proposed emergency generator. Reference: Sections 106.3.1 and 304.1, IMC 2006. |
| 03/12/2008 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Show that combining the ¾" drain for the compression tank with the ¾" drain for the pressure relief drain into a ¾" common drain does not violate the listing requirements of the pressure relief valve. Reference: Section 310.4, UPC 2006. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/20/2008 | DELMA ROBEY | OUT TO CUSTOMER | Completed |
| 03/20/2008 | SUE REEVES | REJECT SHELF | Completed |