Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 1ST
Permit Number - T08CM00587
Review Name: REVISION - - 1ST
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/15/2009 | RONALD BROWN | BUILDING-COMMERCIAL | REVIEW | Approved | |
| 12/15/2009 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Revise the access ladder shown in detail 3/A2.3 to comply with the requirements of Section 306.5, IMC 2006. 2. Show the size, routing, and termination of the condensate drain for FCU-1. Reference: Section 307.2, IMC 2006 and Section 814.0, UPC 2006. 3. Has power been provided to FCU-1? Reference: Section 3006, IBC 2006. |
| 12/15/2009 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the size of the "thru-wall drains" (scuppers) shown in detail 10/A2.3 to comply with the requirements of Section 1101.11.2.1, UPC 2006. Both scuppers appear to drain enough roof area to require a minimum width of 9.4". 2. Coordinate the water riser diagram 2/P4 with the plumbing plans on the 3rd floor (fixtures P3 and P4 are missing) and the 1st floor (one P1 is labeled as a P2). Reference: Section 103.2.3, UPC 2006. |
| 12/16/2009 | RAY MAJUTA | ELECTRICAL-COMMERCIAL | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/24/2009 | CPIERCE1 | OUT TO CUSTOMER | Completed |
| 12/24/2009 | CPIERCE1 | REJECT SHELF | Completed |