Permit Number: T08CM00587
Parcel: 122184340

Review Status: Completed

Review Details: POST 3RD PARTY REVIEW

Permit Number - T08CM00587
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/05/2008 ROBERT SHERRY WATER REVIEW Approved
09/05/2008 MARTIN BROWN FIRE REVIEW Denied Please include the following design criteria to the plans.
1. Flow data (static pressure, residual pressure, GPM)
Available from the Fire Department (520) 791-3234
2. The standard to be used in development of sprinkler system. (NFPA 13, NFPA 13R, or NFPA 13D)
3. The hazard classification of the building, including any special hazards.
4. The density required of the water supply.
09/08/2008 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: Monte V Corporate Center
T08CM00587
Building Plan (1st Review)

TRANSMITTAL DATE: September 8, 2008

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved stamped site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C:\planning\grading\t08cm00587.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents
09/09/2008 PAUL MACHADO ENGINEERING REVIEW Approved
09/12/2008 GERRY KOZIOL WWM REVIEW Approved
09/15/2008 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
11/19/2008 CINDY AGUILAR OUT TO CUSTOMER Completed
11/19/2008 SUE REEVES REJECT SHELF Completed