Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T08CM00429
Parcel: 138240860

Review Status: Completed

Review Details: SITE

Permit Number - T08CM00429
Review Name: SITE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/03/2008 MARTIN BROWN FIRE REVIEW Approved
04/08/2008 HEATHER THRALL ZONING REVIEW Denied TO: Development Services Department, Plans Coordination Office

FROM: Heather Thrall, Senior Planner

PROJECT: T08CM00429, 1477 W. Commerce Court
Phase 3, new office building and small site improvements
Commercial Site Plan, 1st Review

TRANSMITTAL DATE: April 9, 2008

COMMENTS: Please resubmit revised drawings along with redlines and a response letter, which states how all Zoning Review Section comments for Land Use Code and Development Standards were met - OR EMAIL ME FOR A COUNTER APPT.

1. This project was reviewed for compliance with the Land Use Code (LUC) and Development Standards (DS). Specifically, compliance with the criteria in DS 2-02.

2. Per DS 2-02.2.1.7, call out distance between buildings 3 & 4 - at closest edge of roofs.

3. Per DS 2-02.2.1.12, please call out the location of the sidewalk leading to the west entry of building 4, it's too hard to see under the canopy lines. Ensure minimum walkway is dimensioned at 4' wide please.

4. Per DS 2-02.2.1.12, ensure pedestrian gates are a minimum of 4' wide, per DS 2-08.

5. Per DS 2-02.2.1.13, please call out any proposed free-standing signage and lighting with vertical clearance and applicable specifications.

6. Per DS 2-02.2.1.20, please ensure all easements are graphically shown - if applicable - with their recordation information noted next to them.

7. Per DS 2-02.2.2.A.3, under the Floor Area Ratio notes on sheet X1.0 - please revise the total building square footage to read 40639 (building 4 reduced in size from the phase 3 plan) - I acknowledge the same FAR calc end result is .19 and works fine, thank you.

8. I further acknowledge the site has had 3 prior phases approved within the last year, which would mean that the site should be meeting current code compliance now, and when the work is finished on this last phase.

9. I'm willing to do a check of your responses in a meeting at the counter. Email me for an appointment time at Heather.Thrall@tucsonaz.gov

HCT C:\planning\site\DSD\T08CM00429 1477 w commerce ct phase 3.doc
04/09/2008 RBROWN1 ZONING HC SITE REVIEW Approved
04/09/2008 SREEVES1 ADA REVIEW Passed
04/15/2008 PETER MCLAUGHLIN LANDSCAPE REVIEW Approved
04/16/2008 PETER MCLAUGHLIN NPPO REVIEW Passed
05/21/2008 JASON GREEN ENGINEERING REVIEW Denied DATE: May 21, 2008
SUBJECT: COPE Behavioral Services Site/Grading Plan- Engineering Review
TO: Reliable Permits Attn: Joe Barbea
LOCATION: 1477 W Commerce CT, T15S R13E Sec15, Ward 1
REVIEWERS: Jason Green, CFM
ACTIVITY: T08CM00429 (Site Plan) and Grading Plan (T08BU00246)


SUMMARY: Engineering Division of Development Services Department has received and reviewed the submitted site plan and grading plan. The site plan and grading plan is not approved at this time. Please address the following comments:


SITE PLAN COMMENTS:

1) DS Sec2-02.2.1.A.12: Revise the site plan to label and dimension the width of the proposed gates. Per DS Sec.2-08 a minimum 4-foot gate is required.

2) DS Sec2-02.2.1.A.12: Revise the site plan to clearly label and dimension the required pedestrian circulation from existing Building 3 to proposed Building 4.

3) DS Sec.2-02.2.1.A.16: Revise the site plan and Keynote #14 to provide a modified Type 1 scupper that is proposed for the 2-cells at concentration points 10.7 and 10.7A. Per Standard Public Improvement Detail 204 a Type 1 scupper does not dimension a 2-cell width, revise.


GRADING PLAN:

4) DS Sec.11-01.4.1.C.3: Revise the grading plan, Sheet C2, to include keynote #14 on the south side of the proposed building. This landscape area must be depressed a minimum of 6-inch to maximize water harvesting and to ensure the drainage of the swale and roof runoff.

5) DS Sec.11-01.4.1.C.4: Revise the grading plan, Sheet C2, to verify the scupper location for the existing concentration point 10.3.

6) DS Sec.11-01.4.1.C.4: Revise the grading plan and Sheet C2, to clarify the runoff location for concentration point 10.3B. Verify if there is a wall opening or if the portion of this area is wrought iron, flow through.

7) DS Sec.11-01.4.1.C.4: Revise the site plan and Keynote #14 to provided a modified Type 1 scupper that is proposed for the 2-cells at concentration points 10.7 and 10.7A. Per Standard Public Improvement Detail 204 a Type 1 scupper does not dimension a 2-cell width, revise.

8) Please ensure the grading plan is consistent with the site plan and drainage report. Grading standards may be accessed at: http://www.ci.tucson.az.us/dsd/DevStandsTOC.pdf

GENERAL COMMENTS:

Please provide a revised site plan and grading plan that address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

Further comments may be generated upon resubmittal of the site plan and grading plan. Please enclose "redlines" with the resubmittal package for reference.

For any questions or to schedule a meeting, call me at 837-4929.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
Development Services

Final Status

Task End Date Reviewer's Name Type of Review Description
05/23/2008 BETH GRANT OUT TO CUSTOMER Completed
05/23/2008 SUE REEVES REJECT SHELF Completed