Permit Review Detail
Review Status: Completed
Review Details: FLOODPLAIN
Permit Number - T07OT00868
Review Name: FLOODPLAIN
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/17/2007 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | Plan needs to reflect Draiange Report. Meeting required to go over remaining items to address for FPUP approval. - EE |
| 04/17/2007 | ELIZABETH EBERBACH | ENGINEERING | REVIEW | Denied | DATE: April 27, 2007 TO: Richard Beach, RA, for Cindy Sylvester, RA, for Bill Zimmerman, PE SUBJECT: Sheriff building addition improvements LOCATION: 1250 W Silverlake Rd, T14S R13E Sec23, Ward 1 REVIEWER: Elizabeth Eberbach, PE ACTIVITY: T07OT00868 (Floodplain Use Permit) SUMMARY: The subject property and proposed improvements are located within an X shaded flood zone and within a SFHA Zone AE as shown on the Flood Insurance Rate Map (FIRM), Community- Panel No. 04019C-2228K, effective date February 8, 1999. Erosion protection improvements are proposed to accommodate for the proposed addition to the existing Sheriff's building. Engineering Division of the City of Tucson Development Services Department has received and reviewed the submittal package and recommends approval. FLOODPLAIN USE PERMIT CONDITIONS: THE FOLLOWING 11 CONDITIONS APPLY TO THE FLOODPLAIN USE PERMIT T07OT00868: 1) WITHIN 5 (FIVE) DAYS OF ISSUANCE OF THIS PERMIT, AND THROUGH COMPLETION OF THE PROJECT, NOTIFICATION MUST BE POSTED AND MAINTAINED IN A CONSPICUOUS PLACE ON THE JOB SITE STATING "CONSTRUCTION PROCEEDING UNDER REQUIREMENTS OF CITY OF TUCSON FLOODPLAIN USE PERMIT # T07OT00868. 2) FOR DSD ENGINEERING INSPECTIONS, PLEASE CALL 837-9089." 3) THIS PERMIT BECOMES INVALID AND IS SUBJECT TO ADDITIONAL FLOODPLAIN REVIEW, IF ANY REQUIRED DEVELOPMENT PERMIT CHANGES THE CONFIGURATION OF THE IMPROVEMENT, OR, IF THERE IS ANY FURTHER DISTURBANCE WITHIN THE FLOODPLAIN OTHER THAN THAT OUTLINED IN THIS APPLICATION. THIS FLOODPLAIN USE PERMIT MAY BE SUBJECT TO CONDITIONS OR RESTRICTIONS DESIGNED TO REDUCE OR MITIGATE THE POTENTIAL DAMAGE OR HAZARD TO LIFE OR PROPERTY RESULTING FROM DEVELOPMENT WITHIN THE REGULATORY FLOODPLAIN, FLOODWAY OR EROSION HAZARD AREAS AS DETERMINED BY THE PROJECT ENGINEER AND ACCEPTED BY THE CITY OF TUCSON. 4) THIS FLOODPLAIN USE PERMIT AND APPROVED PLANS SHALL BE KEPT IN A READILY ACCESSIBLE LOCATION ON SITE AT ALL TIMES. 5) ANY ADDITIONAL FUTURE DISTURBANCE OF THE FLOODPLAIN SHALL HAVE SEPARATE FLOODPLAIN USE PERMIT APPLICATIONS SUBMITTED TO THIS OFFICE FOR REVIEW AND APPROVAL. 6) EXCEPT AS APPROVED BY THE CITY ENGINEER PRIOR TO THE START OF CONSTRUCTION, DEVELOPMENT UNDER THIS PERMIT SHALL NOT OBSTRUCT, RETARD OR DIVERT THE EXISTING FLOW OF FLOODWATERS FROM OR TO ADJACENT PROPERTIES. 7) ALL WORK SHALL CONFORM TO THE APPROVED SITE PLAN SHEET A0.2 FOR THE ELECTRICAL CONTROLLER AND PUMP INSTALLATION, SEALED BY RICHARD BEACH, RA (4/24/07), WHICH IS MADE PART OF THIS PERMIT. 8) CONTACT ENVIRONMENTAL SERVICES FOR ANY FOUNDATION REQUIREMENTS FOR PROXIMITY TO THE CLOSED 29TH STREET LANDFILL. 9) THERE SHALL BE NO DISTURBANCE OUTSIDE OF LIMITS OF CUT AND FILL AS INDICATED ON PLANS. 10) SPECIAL INSPECTIONS BY A QUALIFIED REGISTRANT ARE REQUIRED FOR THE TOEDOWN CONSTRUCTION / DEPTH, TIE-IN TO EXISTING BANK PROTECTION, AND THE COMPACTION OF BACKFILL. DSD ENGINEERING INSPECTORS SHOULD BE CALLED TO THE SITE DURING THESE SPECIAL INSPECTIONS. REPORTS FROM GEOTECHNICAL ENGINEER AND ENGINEER OF RECORD SHOULD BE SUBMITTED TO THE CITY OF TUCSON FOR RECORDS PRIOR TO CALLING IN FOR THE FINAL DSD FLOODPLAIN INSPECTION BY THE CITY OF TUCSON DEVELOPMENT SERVICES DEPARTMENT. 11) THERE SHALL BE NO STOCKPILING MATERIAL WITHIN THE WEST BRANCH OF THE SANTA CRUZ. I can be reached at 837-4934 if you have questions. Elizabeth Eberbach, PE, CPM, CFM Civil Engineer Engineering Division Development Services Department |
| 04/27/2007 | ELIZABETH EBERBACH | ENGINEERING | Resubmital at counter | Approved | Plan needs to reflect Draiange Report. Meeting required to go over remaining items to address for FPUP approval. - EE |
| 04/27/2007 | ELIZABETH EBERBACH | ENGINEERING | Resubmital at counter | Approved | DATE: April 27, 2007 TO: Richard Beach, RA, for Cindy Sylvester, RA, for Bill Zimmerman, PE SUBJECT: Sheriff building addition improvements LOCATION: 1250 W Silverlake Rd, T14S R13E Sec23, Ward 1 REVIEWER: Elizabeth Eberbach, PE ACTIVITY: T07OT00868 (Floodplain Use Permit) SUMMARY: The subject property and proposed improvements are located within an X shaded flood zone and within a SFHA Zone AE as shown on the Flood Insurance Rate Map (FIRM), Community- Panel No. 04019C-2228K, effective date February 8, 1999. Erosion protection improvements are proposed to accommodate for the proposed addition to the existing Sheriff's building. Engineering Division of the City of Tucson Development Services Department has received and reviewed the submittal package and recommends approval. FLOODPLAIN USE PERMIT CONDITIONS: THE FOLLOWING 11 CONDITIONS APPLY TO THE FLOODPLAIN USE PERMIT T07OT00868: 1) WITHIN 5 (FIVE) DAYS OF ISSUANCE OF THIS PERMIT, AND THROUGH COMPLETION OF THE PROJECT, NOTIFICATION MUST BE POSTED AND MAINTAINED IN A CONSPICUOUS PLACE ON THE JOB SITE STATING "CONSTRUCTION PROCEEDING UNDER REQUIREMENTS OF CITY OF TUCSON FLOODPLAIN USE PERMIT # T07OT00868. 2) FOR DSD ENGINEERING INSPECTIONS, PLEASE CALL 837-9089." 3) THIS PERMIT BECOMES INVALID AND IS SUBJECT TO ADDITIONAL FLOODPLAIN REVIEW, IF ANY REQUIRED DEVELOPMENT PERMIT CHANGES THE CONFIGURATION OF THE IMPROVEMENT, OR, IF THERE IS ANY FURTHER DISTURBANCE WITHIN THE FLOODPLAIN OTHER THAN THAT OUTLINED IN THIS APPLICATION. THIS FLOODPLAIN USE PERMIT MAY BE SUBJECT TO CONDITIONS OR RESTRICTIONS DESIGNED TO REDUCE OR MITIGATE THE POTENTIAL DAMAGE OR HAZARD TO LIFE OR PROPERTY RESULTING FROM DEVELOPMENT WITHIN THE REGULATORY FLOODPLAIN, FLOODWAY OR EROSION HAZARD AREAS AS DETERMINED BY THE PROJECT ENGINEER AND ACCEPTED BY THE CITY OF TUCSON. 4) THIS FLOODPLAIN USE PERMIT AND APPROVED PLANS SHALL BE KEPT IN A READILY ACCESSIBLE LOCATION ON SITE AT ALL TIMES. 5) ANY ADDITIONAL FUTURE DISTURBANCE OF THE FLOODPLAIN SHALL HAVE SEPARATE FLOODPLAIN USE PERMIT APPLICATIONS SUBMITTED TO THIS OFFICE FOR REVIEW AND APPROVAL. 6) EXCEPT AS APPROVED BY THE CITY ENGINEER PRIOR TO THE START OF CONSTRUCTION, DEVELOPMENT UNDER THIS PERMIT SHALL NOT OBSTRUCT, RETARD OR DIVERT THE EXISTING FLOW OF FLOODWATERS FROM OR TO ADJACENT PROPERTIES. 7) ALL WORK SHALL CONFORM TO THE APPROVED SITE PLAN SHEET A0.2 FOR THE ELECTRICAL CONTROLLER AND PUMP INSTALLATION, SEALED BY RICHARD BEACH, RA (4/24/07), WHICH IS MADE PART OF THIS PERMIT. 8) CONTACT ENVIRONMENTAL SERVICES FOR ANY FOUNDATION REQUIREMENTS FOR PROXIMITY TO THE CLOSED 29TH STREET LANDFILL. 9) THERE SHALL BE NO DISTURBANCE OUTSIDE OF LIMITS OF CUT AND FILL AS INDICATED ON PLANS. 10) SPECIAL INSPECTIONS BY A QUALIFIED REGISTRANT ARE REQUIRED FOR THE TOEDOWN CONSTRUCTION / DEPTH, TIE-IN TO EXISTING BANK PROTECTION, AND THE COMPACTION OF BACKFILL. DSD ENGINEERING INSPECTORS SHOULD BE CALLED TO THE SITE DURING THESE SPECIAL INSPECTIONS. REPORTS FROM GEOTECHNICAL ENGINEER AND ENGINEER OF RECORD SHOULD BE SUBMITTED TO THE CITY OF TUCSON FOR RECORDS PRIOR TO CALLING IN FOR THE FINAL DSD FLOODPLAIN INSPECTION BY THE CITY OF TUCSON DEVELOPMENT SERVICES DEPARTMENT. 11) THERE SHALL BE NO STOCKPILING MATERIAL WITHIN THE WEST BRANCH OF THE SANTA CRUZ. I can be reached at 837-4934 if you have questions. Elizabeth Eberbach, PE, CPM, CFM Civil Engineer Engineering Division Development Services Department |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/30/2007 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |