Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T07CM00308
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/12/2007 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. AC Unit is 240V on Power Plan and Electrical Panel, but the Packaged Rooftop Schedule calls for 208V. Please clarify. 2. Provide conductor size for the unit above. 3. EH1 and EH2 are 240V on Power Plan, but the Electric Unit Heater Schedule calls for 208V. Please clarify. 4. Provide electrical circuits for EH-1 and EH-2. SECOND REQUEST. No panel/circuit indicated on Power Plan, and could not find on panel schedules. Add to load calculations as well, and take care not to overload any panel/service. |
| 04/16/2007 | TERRY STEVENS | ZONING | REVIEW | Denied | 04/16/07 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved site plan. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site plan. Additional comments may be forthcoming. |
| 04/25/2007 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Comment not addressed. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003. 2. Show the route and termination of the excess pressure relief valve for the water heater. Reference Section 608.3 UPC 2003. 3. Show the waste and vent piping for the floor drains (P-10) on the waste and vent diagram. Reference Section 103.2.3, UPC 2003. 4. Based on the provided water calculations, the piping supplied to the new restroom and the kitchen appears to be undersized. Include the ice machine and the carbonator in the demand calculations. Reference Section 610.0, UPC 2003. 5. The specifications for the grease interceptor indicate that it has not been installed in accordance with the manufacturer's recommendations and Section 1014.0, UPC 2003. Also, show the location and venting of the flow control device. Reference Section 103.2.3, UPC 2003. |
| 04/25/2007 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 04/26/2007 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The provided detail for the support of the hood, EH-1 does not show a clearance of 18" from combustible materials (e.g. the double 2x8 supports). Reference Sections 507.6 and 507.9, IMC 2003. 2. Revise the design of the walls adjacent to the Type I hood to comply with Section 507.9, IMC 2003. 3. Comment not addressed. Show how the portion of the Type I hood penetrating the ceiling complies with the requirements of Section 506.3.10, IMC 2003. Reference Section 507.10, IMC 2003. 4. Revise the location of the hood exhaust fan to comply with the requirements of Section 506.5.5, IMC 2003. 5. The specified electric heaters are not capable of maintaining a minimum temperature of 68°F in the interior spaces intended for occupancy on a design heating day (32°F). The make up air required for the Type I hood will introduce a load far greater than the electric heaters can offset and the flow of outside air will be continuing beyond the time that the kitchen equipment is turned on. Reference Sections 309.1 and 312.1, IMC 2003. 6. Comment not addressed for the AC unit. Show the size, routing, and termination of the condensate drains. Reference Section 307.2, IMC 2003 and Section 807.2, UPC 2003. |
| 05/04/2007 | CHRIS KIEL (WILDAN) | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Provide drinking fountain per table 2902.1 per IBC 2003. Drinking fountain spout heights and water flow per ANSI A117.1 2003 602.4 and 602.6. COMMENT REMAINS: Provide details for the drinking fountain to verify compliance with ANSI 117.1-2003 section 602. 2) Door swings for restrooms shall swing in therefore does not encroach on maneuvering clearance required to open door per Chapt. 4 ANSI A117.1 2003. COMMENT REMAINS: Provide the required maneuvering clearance on the pull side of the accessible restroom doors per section 404.2.3 of ANSI 117.1-2003. The current submittal shows the water closet within the maneuvering clearance. 3) Provide cost breakdown on the plans per 2003 IBC section 3409.6 to justify 20% cost of construction. COMMENT REMAINS 4) Verify how egress will be provided between the dining and kitchen areas per section 106.1.1 of the 2003 IBC. 5) Provide treated plates per section 2304.11.2.3 of the 2003 IBC. |
| 05/04/2007 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | An approved site plan is required prior to building plan approval. |
| 05/07/2007 | GERRY KOZIOL | WWM | REVIEW | Denied | NEEDS 8TH FLOOR CREDIT EVALUATION |