Plan Review Detail
Review Status: Completed
Review Details: PIA RESUBMITTAL
Plan Number - T06PI00041
Review Name: PIA RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/26/2006 | TAMI HAUSER | ENGINEERING | REVIEW | Needs Review | |
| 10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT STREETS DIVISION | Denied | SUBMIT UTILITY LETTERS FOR CITY OF TUCSON STREETS DIVISION, COX COMMUNICATIONS, AND KINDER MORGAN. |
| 10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | COT WATER NEW DEVELOPMENT | Completed | SUBMIT UTILITY LETTERS FOR CITY OF TUCSON STREETS DIVISION, COX COMMUNICATIONS, AND KINDER MORGAN. |
| 10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | PC WASTEWATER MGMT | Completed | SUBMIT UTILITY LETTERS FOR CITY OF TUCSON STREETS DIVISION, COX COMMUNICATIONS, AND KINDER MORGAN. |
| 10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | QUEST COMMUNICATION | Completed | SUBMIT UTILITY LETTERS FOR CITY OF TUCSON STREETS DIVISION, COX COMMUNICATIONS, AND KINDER MORGAN. |
| 10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | TUCSON ELECTRIC POWER CO | Completed | SUBMIT UTILITY LETTERS FOR CITY OF TUCSON STREETS DIVISION, COX COMMUNICATIONS, AND KINDER MORGAN. |
| 10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | COX COMMUNICATION | Denied | SUBMIT UTILITY LETTERS FOR CITY OF TUCSON STREETS DIVISION, COX COMMUNICATIONS, AND KINDER MORGAN. |
| 10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | SOUTHWEST GAS CORP | Completed | SUBMIT UTILITY LETTERS FOR CITY OF TUCSON STREETS DIVISION, COX COMMUNICATIONS, AND KINDER MORGAN. |
| 10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | EL PASO NATURAL GAS | Completed | SUBMIT UTILITY LETTERS FOR CITY OF TUCSON STREETS DIVISION, COX COMMUNICATIONS, AND KINDER MORGAN. |
| 10/28/2006 | TAMI HAUSER | UTILITY CLEARANCES | KINDER MORGAN ENERGY | Denied | SUBMIT UTILITY LETTERS FOR CITY OF TUCSON STREETS DIVISION, COX COMMUNICATIONS, AND KINDER MORGAN. |
| 10/31/2006 | GARY WITTWER | DOT LANDSCAPE | REVIEW | Approved | |
| 11/14/2006 | LANCE PETERSON | DOT STREET MAINTENANCE | REVIEW | Approved | |
| 11/27/2006 | Estevan Tineo | DOT ENGINEERING | REVIEW | Denied | November 27, 2006: T06PI00041 (Sunnyside Elementary School): 1. Is the public sewer part of this project a separate submittal or is it part of this plan? If it is, then the Pima County Waste Water signature line should be provided on the cover sheet and the corresponding PCWW plan number. 2. Sheet 2 of 3: Provide pedestrian access easements, for public pedestrian access, at the two proposed access ramps located at Sun View Way. 3. Sheet 2 of 3: Note 7 indicates new sidewalk and the plan view shows 4' sidewalk? According to the City Development Standards, 5' sidewalk is required. Why is 4' sidewalk proposed? Revise accordingly. 4. Sheet 3 of 3: Detail 3 of 3 does not represent the proposed sidewalk location. This detail indicates a "shy" space between curbing and sidewalk. However, Detail 1 of 3 indicates sidewalk against vertical curbing? Please revise detail accordingly. 5. Sheet 3 of 3: Detail 6 of 3 is confusing. The detail seems to indicate concrete gutter, and is not clear where the landing starts? Please revise detail to indicate ramp grades, landing area, and other items as needed to detail proposed ramps. In addition please indicate r/w line. 6. Sheet 3 of 3: Based on the plan view, Detail 5 of 3 is not sufficient to detail these ramps. Please provide a detail for each ramp detailing specific issues (pedestrian access) at each ramp. |
| 11/28/2006 | TAMI HAUSER | PIA COORDINATOR | CUSTOMER CALLED; PLANS @ AMBASSADOR | Completed | |
| 11/28/2006 | TAMI HAUSER | PIA COORDINATOR | OUT TO CUSTOMER | Completed |