Permit Number: T06OT02355
Parcel: 10610087H

Address:
1830 W PRINCE RD

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T06OT02355
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/30/2006 SUZANNE BOHNET ENGINEERING REVIEW Approved October 31, 2006

FLOODPLAIN USE PERMIT NO.: T06OT02355
RELATED PROJECT: T06CM00856 / T06BU02317
ADDRESS: 1830 W. Prince Rd.
APPLICANT: Thomas Fraser

The applicant is authorized to use a portion of the City of Tucson property described as (legal description): PRINCE-ROMERO BUSINESS CENTER PTN W214.69' BLK A FW 2.16 AC

1. This permit is for the purpose of construction of a commercial retail building within a mapped Flood Hazard Area, Zone X (Shaded), as shown on the Flood Insurance Rate Map (FIRM), Community Panel No. 040076-04019C-1619K, effective date February 8, 1999.

2. The proposed structure is impacted by the regulatory floodplain. For purposes of this permit, the following elevation requirements apply:

Base Flood Elevation (BFE) = 2290.0 feet per the National Geodetic Vertical Datum (NGVD '29)
Regulatory Flood Elevation (RFE) = 2291.0 feet per the National Geodetic Vertical Datum (NGVD '29)

The top of the lowest finished floor (FFE) shall be elevated at or above the Regulatory Flood Elevation (RFE). Service facilities, such as electrical equipment, shall be constructed at or above the RFE and either be placed on flood proof materials or be adequately flood proofed.

Prior to the pouring of the first slab or finish floor installation, a Building-Under-Construction Elevation Certificate, completed and certified by an Arizona Registered Land Surveyor, must be returned to the Engineering Division of the Development Services Department. A hold will be placed on the slab inspection (P2S) until the Elevation Certificate has been returned and approved.

Prior to any final inspections, a Finished Construction Elevation Certificate, completed and certified by an Arizona Registered Land Surveyor, must be returned to the Engineering Division. A hold will be placed on the final inspection (P2F) until the Elevation Certificate has been returned and approved.

3. Construction and maintenance of the on-site Retention/Detention Basin shall be in accordance with the approved Drainage Report for Bluewater Marine, sealed by Kevin M. Hall, P.E. of DCC dated 10/23/06.

4. Any additional improvements will require a separate Floodplain Use Permit prior to construction.

Final Status

Task End Date Reviewer's Name Type of Review Description
01/27/2009 SUE REEVES APPROVAL SHELF Completed
01/27/2009 CINDY AGUILAR OUT TO CUSTOMER Completed