Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Withdrwn
Type:
COMMERCIAL OTHER
Address:
1830 W PRINCE RD
Address NEW:
1830 W PRINCE RD
Apply Date:
09/06/2006
Applicant:
THOMAS L FRASER
Description:
FLOODPLAIN USE PERMIT

Permit Reviews

Permit Number - T06OT02355
Permit Status: Withdrwn
Permit Description: FLOODPLAIN USE PERMIT
Start Date Submittal Complete Date Status  
09/06/2006 FLOODPLAIN 10/06/2006 COMPLETED Review Details
10/25/2006 RESUBMITTAL 01/27/2009 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T06OT02355
Permit Status: Withdrwn
Permit Description: FLOODPLAIN USE PERMIT
Total Outstanding Activity Conditions - 1
Date Name
11/07/2006 October 31, 2006 FLOODPLAIN USE PERMIT NO.: T06OT02355 RELATED PROJECT: T06CM00856 / T06BU02317 ADDRESS: 1830 W. Prince Rd. APPLICANT: Thomas Fraser The applicant is authorized to use a portion of the City of Tucson property described as (legal description): PRINCE-ROMERO BUSINESS CENTER PTN W214.69' BLK A FW 2.16 AC 1. This permit is for the purpose of construction of a commercial retail building within a mapped Flood Hazard Area, Zone X (Shaded), as shown on the Flood Insurance Rate Map (FIRM), Community Panel No. 040076-04019C-1619K, effective date February 8, 1999. 2. The proposed structure is impacted by the regulatory floodplain. For purposes of this permit, the following elevation requirements apply: Base Flood Elevation (BFE) = 2290.0 feet per the National Geodetic Vertical Datum (NGVD '29) Regulatory Flood Elevation (RFE) = 2291.0 feet per the National Geodetic Vertical Datum (NGVD '29) The top of the lowest finished floor (FFE) shall be elevated at or above the Regulatory Flood Elevation (RFE). Service facilities, such as electrical equipment, shall be constructed at or above the RFE and either be placed on flood proof materials or be adequately flood proofed. Prior to the pouring of the first slab or finish floor installation, a Building-Under-Construction Elevation Certificate, completed and certified by an Arizona Registered Land Surveyor, must be returned to the Engineering Division of the Development Services Department. A hold will be placed on the slab inspection (P2S) until the Elevation Certificate has been returned and approved. Prior to any final inspections, a Finished Construction Elevation Certificate, completed and certified by an Arizona Registered Land Surveyor, must be returned to the Engineering Division. A hold will be placed on the final inspection (P2F) until the Elevation Certificate has been returned and approved. 3. Construction and maintenance of the on-site Retention/Detention Basin shall be in accordance with the approved Drainage Report for Bluewater Marine, sealed by Kevin M. Hall, P.E. of DCC dated 10/23/06. 4. Any additional improvements will require a separate Floodplain Use Permit prior to construction.