Review Date Reviewer's Name Type of Review Description Status Comments
06/20/2007 ROBERT SHERRY WATER REVIEW Approved
06/20/2007 MARTIN BROWN FIRE REVIEW Denied Please add the following automatic sprinkler criteria to the plans:

1. The hazard classification of the occupancy, including any special hazards, for all parts of building(s).
2. The design standard to be used.
3. The availability and adequacy of the water supply. (flow data)
4. The design densities and areas of operation.

Also, regarding Delta 1 note on fire protection, separate submittals also required for fire service underground piping and kitchen exhaust hood fire suppression system(s).
06/22/2007 GERRY KOZIOL WWM REVIEW Denied 1:HERMOSA VILLAGE APARTMENTS
2:CONNECTING TO ON-SITE PRIVATE #PT07S02218
3:1397FU SFR CREDIT & 84FU COMM CREDIT ALLOWED PER PERMIT #ZP-7029 (2/22/73) & ACTIVE USER SEWER BILL PER WW/YS 5/11/06
4:CANNOT BACKWASH POOL/SPA INTO PUBLIC SEWER-NEED TO INDICATE CLEARLY ON PLUMBING DRAWINGS
5:ROOF FLOOR SINKS MUST BE DESIGNED TO PREVENT RAINWATER INTRUSION- NEED TO CLARIFY ON DRAWINGS
6:CANNOT DRAIN ELEVATOR SUMP TO SEWER AS SHOWN ON PLUMBING DRAWING P.1.1.1- 2" DRAINS NOT INCLUDED ABOVE
07/02/2007 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: T06CM06423
Building Plan (1st Review)

TRANSMITTAL DATE: July 2, 2007

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved site plan. The development plan will need to be reviewed as a site plan. This review can be done over the counter. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

C:\planning\grading\t06cm06423.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents
07/02/2007 JOHN WILLIAMS COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Completed Impact Fee's Do Apply; East District; Senior Living (Residential) with Restaurant Facilities; $62,419.52

Credit for 67,689 Sq. Ft. for Demo.
07/02/2007 STEVE SHIELDS ZONING REVIEW Denied DSD TRANSMITTAL

FROM: Steve Shields
Lead Planner

PROJECT: T06CM06423
Building Plan (1st Review)

TRANSMITTAL DATE: July 2, 2007

1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. Zoning could not verify that the building plan was in compliance with the approved site plan. The development plan will need to be reviewed as a site plan. This review can be done over the counter. Please submit two copies of the approved and stamped site, landscape, and NPPO plans with the next building plan submittal.

3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved and stamped site plan. Additional comments may be forthcoming.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956.

C:\planning\grading\t06cm06423.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised site plan and additional requested documents
07/11/2007 SREEVES1 ENGINEERING REVIEW Needs Review

Final Status

Task End Date Reviewer's Name Type of Review Description
07/18/2007 CINDY AGUILAR APPROVAL SHELF Completed
07/18/2007 CINDY AGUILAR OUT TO CUSTOMER Completed