Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T06CM03653
Parcel: 12714003F

Review Status: Completed

Review Details: COMMERCIAL-BLDG/FIRE/ZONING/ENG

Permit Number - T06CM03653
Review Name: COMMERCIAL-BLDG/FIRE/ZONING/ENG
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/14/2006 DAVE MANN FIRE REVIEW Approved
07/14/2006 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
07/14/2006 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
07/14/2006 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Revise the font size used on the drawings to a minimum of 1/8-inch (all upper case). Reference Section 302.3, Uniform Administrative Code, 1997.
2. Show how adequate access is being provided for the equipment located on the roof. Reference Section 306.5, IMC 2003.
3. Provide a detail showing how the piping for the solar collecting system conforms to the manufacturer's recommended installation and protects the system, building, and occupants from excessive fluid pressure and temperature. Reference Sections 304.1 and 1402.5.1, IMC 2003.
4. Show that the solar collectors and any supporting structures mounted on the roof are made of materials consistent with the construction classification of the building. Reference Section 1402.4.1, IMC 2003.
07/14/2006 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied Provide an electrical circuit for the controller.
07/27/2006 DOUG LAAKSO BUILDING-COMMERCIAL REVIEW Denied T06CM03653.. 373 NORTH WILMOT ROAD .. GULL SUN COIL SOLAR POOL HEATING COLLECTOR .. DGL ..1ST STRUCTURAL REVIEW .. 8/4/06 ..

TRANSMIT PRIOR SUBMITTAL/S WITH NEXT SUBMITTAL.

Provide a Response Letter, by the Registrant of Record, with the re-submittal addressing each comment listed in Structural Review.

S1. Provide completed Code Review Checklist, as required by 1997 Uniform Administrative Code Section 302.1, including: Job Address, Architect, Signature, Date, Summary of Governing Regulations, General Building Summary and Allowable Area Calculation. See DSD website : www.tucsonaz.gov/dsd, for form.
S2. Provide Official Address Slip from Pima County Addressing . Show location of address on Building per Pima County Addressing Ordinance and IBC section 501.2 on the drawings.
S3. Provide site plan showing location of the work sealed and signed by Registrant of Record.
S4. Provide roof plan dimensionally locating roof mounted equipment on the roof by dimension from two adjacent sides of roof, sealed and signed by Registrant of Record.
S5. Show attachment detail for the roof mounted equipment on plan sealed and signed by Registrant of Record.
S6. Show roof penetrations, if any and address weatherproofing on plans sealed and signed by Registrant of Record.


Questions? Call Douglas Laakso Structural Plans Examiner for the City of Tucson Development Services Department at (520) 791-5550 x1111, email at <Doug.Laakso@tucsonaz.gov.> or visit City of Tucson , DSD website : www.tucsonaz.gov/dsd.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/13/2006 JMORALE1 OUT TO CUSTOMER Completed
09/13/2006 SUE REEVES REJECT SHELF Completed