Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T06CM03360
Parcel: 12213035B

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T06CM03360
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/03/2006 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. The applicable code for all commercial plumbing projects is the 2003 Uniform Plumbing Code with Local Amendments.
2. Provide the minimum plumbing facilities required by Table 2902.1, IBC 2003, for business occupancy
3. Provide complete plumbing plan, including water supply isometrics, waste and vent isometrics, and gas piping to show how changes to the existing plumbing facilities will be accomplished. Reference Section 103.2.3, UPC 2003.
4. Provide information to show that the hub drain complies with Sections 412.1 and 804.1, UPC 2003.
5. Indirect waste receptors (i.e. a hub drain) shall not be installed in a closet or cupboard. Reference Section 804.1, UPC 2003.
07/03/2006 ROBERT SHERRY WATER REVIEW Approved
07/03/2006 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. The 2003 International Mechanical Code with Local Amendments is the relevant code for this project (sheet M1).
2. Provide manufacturer's equipment data along with refrigerant quantities and electrical operating information for the new air handlers and air-cooled condensing units. Reference Section 301.6, IMC 2003.
3. Provide support details for the new air-cooled condensing units. Reference Section 302.1, IMC 2003.
4. Provide information to show how the condensate drain system has been sized. Reference Section 307.2.2, IMC 2003, as amended by the City of Tucson.
5. Provide calculations demonstrating adequate ventilation for the project. Reference Section 401.2, IMC 2003.
6. Provide information on the sequence of operation for the restroom exhaust to show that recirculation of the air from the restroom will not occur. Reference Section 403.2.1, IMC 2003.
07/03/2006 MARTIN BROWN FIRE REVIEW Approved
07/06/2006 GERRY KOZIOL WWM REVIEW Denied need plumbing drawings- note #10 on page 1 talks about plumbing changes
07/12/2006 BOB SUBA ELECTRICAL-COMMERCIAL REVIEW Denied 1.Provide the available fault current with calculations. 2.Provide detail on the bus duct and all loads associated with.3.Provide complete load calculations and provide the size of existing service lateral conductors(insulation type,copper-aluminum,etc. 4.Provide IECC budget calculations.5.See attached electrical plan review requirements.
07/19/2006 BETH GRANT COMMERCIAL IMPACT FEE COMMERCIAL IMPACT FEE PROCESSING Passed
08/10/2006 RAUL PALMA BUILDING-COMMERCIAL REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
08/23/2006 VFLORES1 OUT TO CUSTOMER Completed
08/23/2006 SUE REEVES REJECT SHELF Completed