Permit Number: T06CM02975
Parcel: 119310120

Review Status: Completed

Review Details: RESUBMITTAL

Permit Number - T06CM02975
Review Name: RESUBMITTAL
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/20/2008 ELIZABETH EBERBACH ENGINEERING REVIEW Approved SUBJECT: 3007 W Via De Suenos HDZ 4th Engineering Review
REVIEWER: Elizabeth Eberbach
ACTIVITY NUMBER: T07BU01547, T06SA00248, T06CM02975

SUMMARY: The revised residential overlay package with site/grading plans were received and reviewed by Engineering. The Overlay package was submitted and reviewed with the revised site/grading plans. Accuracy of data appears to be within a reasonable tolerance; ACS calculation for this parcel is accepted. Engineering recommends approval of the Overlay review, and recommends approval of the site / grading plan reviews for grading permit issuance. The following conditions apply to the grading permit.

GRADING PERMIT CONDITIONS:
The following 11 conditions apply to grading permit T07BU01547:
1) Call for Pre-construction meeting. For a DSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Development Services Department, or contact DSD Engineering at 791-5550 extension 2101, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html
2) A copy of the Grading Plan and Grading Permit shall be kept at the site at all times, until final grading approval.
3) Any revision to the Grading Plan MAY require a re-submittal of a revised grading plan for review. Contact DSD Engineering at 791-5550 to discuss changes in grading design.
4) At intermediate inspection stage, call for inspections of rear cut slope and interceptor swale construction.
5) Besides pre-con, intermediate, and final inspections, call DSD Engineering Inspector for interceptor swale construction inspections.
6) If grading construction is expected to last longer than the expiration date of the grading permit, contact DSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.
7) Erosion protection shall be provided in the form of handplaced rip rap with filter fabric, or grouted handplaced rip rap at ends of drainageways or channels prior to outflowing onto natural desert areas or access easement to assure permanent erosion protection.
8) There shall be no disturbance outside of the approved disturbance/grading limits as shown on the approved plan. If disturbance occurs outside of the grading limits (except for installation of septic system emitter field) the site will be subject to Stop Work Order and/or resubmittal review of the overlay, site, and grading plans, as well as additional fees.
9) Area next to south side of building near base of cut slope shall provide positive drainage from structure. Consider impervious material at this location.
10) Separate building permit applications / reviews are required for any walls.
11) The permitee shall notify the DSD when the grading operation is ready for final grading inspection. Final grading approval shall not be given until all work, including installation of all drainage improvements and their permanent protective devices, and all erosion control measures have been completed in accordance with the approved grading plan and grading permit, and all conditions of permit are completed.

If you have questions, you may call me at 837-4934.

Elizabeth Eberbach, PE
Civil Engineer
Engineering Division
Development Services Department

Final Status

Task End Date Reviewer's Name Type of Review Description
06/12/2009 CINDY AGUILAR APPROVAL SHELF Completed
06/12/2009 CINDY AGUILAR OUT TO CUSTOMER Completed