Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T06CM01911
Parcel: 133200180

Review Status: Completed

Review Details: POST 3RD PARTY REVIEW

Permit Number - T06CM01911
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/08/2006 ROBERT SHERRY WATER REVIEW Approved
05/08/2006 GERRY KOZIOL WWM REVIEW Approved
05/11/2006 RBABBIT1 LANDFILL REVIEW Approved
05/15/2006 PAUL MACHADO ENGINEERING REVIEW Approved
05/29/2006 DAVID RIVERA ZONING REVIEW Denied 05/29/06

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. Zoning has reviewed the building plans but cannot approve them at this time.

2. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.

3. Zoning will re-review and approve the building plans on the next submittal providing the stamped and approved site plans are included with the building plan package and the building structural portions of the plan review have been approved. See comment 2 for additional info regarding the site plan process.

4. Zoning is willing to review and approve the building plans over the counter with an appointment once the site plan item as noted in comment 3 has been taken care of.

Please call me to schedule an appointment once the development plan has been rubber stamped as a site plan. Please folow the procedure as noted in comment 3 before scheduling an appointment with me. You may also call Patricia Gehlen for the same process. Although Trish is extremely busy she is willing, with an appointment to review and approve these types of building plans where zoning is the remaining reviewer.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/31/2006 CINDY AGUILAR APPROVAL SHELF Completed
05/31/2006 CINDY AGUILAR OUT TO CUSTOMER Completed