Permit: T06CM01911
Permit Details
Apply Date:
04/04/2006
Applicant:
ROB CAYLOR
Description:
NEW OFFICE BUILDING
Contractors:
- CAYLOR CONSTRUCTION COMPANY , RO
Permit Reviews
Permit Number - T06CM01911
Permit Status: Final
Permit Description: NEW OFFICE BUILDING
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/13/2007 | 3RD PARTY REVIEW-REVISION/OTHER | 02/14/2007 | COMPLETED |
| 03/14/2007 | REVISION - SITE | 03/14/2007 | COMPLETED |
| 04/04/2006 | PLANS OK TO SUBMIT - 3RD PARTY | 04/04/2006 | COMPLETED |
| 04/04/2006 | 3RD PARTY REVIEW-COMMERCIAL | 05/08/2006 | COMPLETED |
| 05/08/2006 | POST 3RD PARTY REVIEW | 05/31/2006 | COMPLETED |
| 06/09/2006 | RESUBMITTAL | 06/09/2006 | COMPLETED |
| 06/09/2006 | SITE | 06/09/2006 | COMPLETED |
| 07/26/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 08/07/2006 | COMPLETED |
| 08/07/2006 | POST 3RD PARTY REVIEW | 08/16/2006 | COMPLETED |
| 08/09/2006 | 3RD PARTY REVIEW-REVISION/OTHER | 08/11/2006 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T06CM01911
Permit Status: Final
Permit Description: NEW OFFICE BUILDING
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 04/04/2006 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T06CM01911
Permit Description: NEW OFFICE BUILDING
Total Completed Inspections - 34
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2006 | ELECTRIC - UFER | RSUBA | Approved | IVRS - Inspection :* 3/0 CU. CONNECTED TO 20' #6 REBAR |
| 07/12/2006 | PLUMBING - SEWER HCS CONNECT | RRICH | Approved | IVRS - Inspection :* WATER TEST BUILDING 4" DRAIN + 4" SEWER THRU BUILDING TO EXISTING 4" CLAY 10' SOUTH OF SIDEWALK INCLUDING HCS CONNECTION PER REDLINE ON SITE. SHALL HAVE REDLINE + REVISED APPROVED PLAN ON SITE AT LATER DATE. |
| 07/14/2006 | PLUMBING - YARD WTR LINE/TEST | RRICH | Approved | IVRS - Inspection :* 2" FROM METER THRU BACKFLOW DEVICE INTO SOUTHWEST CORNER OF BUILDING FOR PLUMBING PLAN. SITE PLAN CALL FOR 2 1/2" AND IS NOT APPROVED PLAN PROVIDE APPROVED SITE PLAN WITH THIS INSTALLATION. |
| 08/30/2006 | BUILDING PRE-SLAB | JBURGE | Approved | IVRS - Inspection :* |
| 09/13/2006 | REINFORCED MASONRY PRE-GROUT | JBURGE | Approved | IVRS - Inspection :* LINES F/18-D.5/19 @ 17'4", ALL COLUMNS TO 10' 4" (OK TO GROUT & CAP) |
| 09/26/2006 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | IVRS - Inspection :* LOADING ZONE & TRASH BIN OK TO POUR |
| 10/18/2006 | ROOF NAILING | JBURGE | Approved | IVRS - Inspection :* OK TO COVER ROOF SYSTEM |
| 10/20/2006 | FIRE SPKLR - UG PIPING FLUSH | LTHOMAS | Approved | |
| 10/20/2006 | FIRE SPKLR - UG, PIPING, HYDRO | LTHOMAS | Approved | |
| 11/02/2006 | FRAMING | JBURGE | Approved | IVRS - Inspection :* |
| 11/09/2006 | FIRE SPKLR - OH PIPING & HYDRO | LTHOMAS | Approved | |
| 12/04/2006 | PLUMBING - ROOF DRAINS | BBENEDON | Approved | IVRS - Inspection :* |
| 12/08/2006 | SHEET ROCK NAILING | JBURGE | Approved | IVRS - Inspection :* SEVERAL WINDOWS ARE MISSING GLAZING WEST & NE ENTRY PANES ABOVE DOOR ARE MISSING FRAMING |
| 12/08/2006 | U VALUE FOR WINDOW | JBURGE | Approved | IVRS - Inspection :* FIRE SPRINKLER ROOM; EAST SEPARATION WALL ENSURE ALL PENETRATIONS ARE FIRE CAULKED WITH AN APPROVED FIRE CAULK SYSTEM. |
| 12/08/2006 | NPPO - FINAL | ACONNOR | Approved | |
| 12/08/2006 | LANDSCAPE - FINAL | ACONNOR | Approved | |
| 12/12/2006 | PLUMBING - ROUGH, SOIL | BBENEDON | Approved | IVRS - Inspection :* UNABLE TO LOCATE PLANS REQUESTED ON 7/12/06 |
| 12/13/2006 | ELECTRIC - UNDERGROUND | RHOLLAND | Approved | IVRS - Inspection :* CALL ON FINAL |
| 12/20/2006 | ELECTRIC - INTERMEDIATE | RHOLLAND | Approved | IVRS - Inspection :* OK EMT CONDUITS 1. CAN WE USE PVC IN THIS BUILDING? |
| 12/22/2006 | ELECTRIC - TEMP POWER FOR TEST | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/26/2006 | TEP CLEARANCE - PM | BFLORES | Approved | TEC PER R.HOLLANDER |
| 12/27/2006 | ELECTRIC - FINAL | RHOLLAND | Approved | IVRS - Inspection :* CANCELLED BY DAVID |
| 12/27/2006 | ELECTRIC - OUTDOOR LIGHTING | RHOLLAND | Approved | IVRS - Inspection :* |
| 12/29/2006 | PLUMBING - FINAL | BBENEDON | Approved | IVRS - Inspection :* 1) NEED ORIGINALLY RED LINED PLANS TO COMPARE WITH REVISED SET-SEE INSPECTION NOTES FROM 7-12 |
| 01/03/2007 | PLUMBING - PRE SLAB | BBENEDON | Approved | |
| 01/05/2007 | FIRE SPKLR - FINAL | LTHOMAS | Approved | |
| 01/08/2007 | FIRE - FINAL | LTHOMAS | Approved | |
| 01/25/2007 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
| 02/02/2007 | BUILDING - FINAL | JBURGE | Approved | IVRS - Inspection :* |
| 02/02/2007 | ELECTRIC - CONSTRUCTION POWER | RHOLLAND | Approved | IVRS - Inspection :* |
| 02/02/2007 | ELECTRIC - CABLE DROP | RHOLLAND | Approved | IVRS - Inspection :* |
| 02/02/2007 | RIGHT OF WAY - FINAL | PWHIDDON | Approved | PER EMAIL |
| 02/16/2007 | OUTDOOR LIGHTING FINAL | RHOLLAND | Approved | IVRS - Inspection :* |
| 03/16/2007 | ENGINEERING - FINAL | JBRUCKME | Approved |