Permit Number: T06CM01753
Parcel: 14108002H

Review Status: Completed

Review Details: POST 3RD PARTY REVIEW

Permit Number - T06CM01753
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/14/2006 MARTIN BROWN FIRE REVIEW Denied 1. Provide complete sprinkler design criteria on plans, including:
a) Identification of hazard classification, including any special hazards.
b) The standard to be used for the construction detail.
c) The availability and adequacy of the water supply.
d) The determination of the design density and area of operations.
2. Driveways on south and east sides of building shall be minimum 20' wide, paved roads with "No Parking - Fire Lane" signs every 100' and approved turn arounds for Fire Department apparatus.
3. Fire Hydrants required per C.O.T. amendments to the IFC 2003, Section 508.5.1 and Section 508.5.2. Total required Fire Flow (with 50% reduction for sprinklers installed in building) will be 2,875 GPM per IFC 2003, Appendix D, Table B105.1.
04/17/2006 ROBERT SHERRY WATER REVIEW Approved
05/03/2006 SEPTIC APPROVAL WWM REVIEW Denied need perc & design for septic review
05/13/2006 DAVID RIVERA ZONING REVIEW Denied 05/13/06

Development Services Department
Zoning Review Section

David Rivera
Principal Planner

Comments:

1. Zoning has reviewed the building plans but cannot approve them at this time until the plans have been completely approved through the commercial review process.

2. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the grading plan can be approved by Zoning. Two copies of the CDRC approved tentative plat/development plan, landscape and NPPO plans are to be submitted with the grading plan packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The tentative plat/development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the grading plans packet processed together for site approval.

3. Zoning will re-review and approve the building plans on the next submittal providing the stamped and approved site plans are included with the building plan package and the building structural portions of the plan review have been approved. See comment 2 for additional info regarding the site plan process.

Final Status

Task End Date Reviewer's Name Type of Review Description
05/16/2006 GBONILL1 OUT TO CUSTOMER Completed