Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T06CM01105
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/23/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 02/23/2006 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 02/23/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Coordinate the electrical design and the mechanical design. Reference Section 106.3.1, IMC 2003. 2. Clarify the extent of the new work and the identify the characteristics of the apparently new equipment. Show that the vacuum pump and the air compressor are listed for outdoor installation. Reference Section 106.3.1, IMC 2003. 3. Specify the materials and spacing of the pipe supports. Reference Sections 305.2 and 305.4, IMC 2003. 4. Show how the equipment is to be mounted and installed. Reference Sections 304.1 and 304.8, IMC 2003. 5. Show how the room pressure will be maintained with the roll up door is closed.Reference Section 501.3, IMC 2003. 6. Provide a mechanical site plan (including lot lines) to show that the dust collector and its exhaust discharge complies with Sections 511.1, IMC 2003. |
| 02/24/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 02/24/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Needs Review | |
| 02/27/2006 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | 1) Provide valuation 2) provide site plan with distances of new equipment from property lines and buildings. 3) Clarify weight of equipment and structural support of equipment. 4) Clarify / detail existing weather cover for equipment. |
| 02/28/2006 | GERRY KOZIOL | WWM | REVIEW | Passed | |
| 02/28/2006 | HEATHER THRALL | ZONING | REVIEW | Approved | |
| 02/28/2006 | SUZANNE BOHNET | ENGINEERING | REVIEW | Approved |