Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T06CM00288
Parcel: 141185330

Review Status: Completed

Review Details: OTHER

Permit Number - T06CM00288
Review Name: OTHER
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/16/2006 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Revise the site drawing to show the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Note: the location of the backflow prevention assembly shall be available to employees of Tucson Water for inspection at all times. Reference Section 103.2.3, UPC 2003.
2. Revise the site drawing to show the size and route of the building fire-suppression water supply along with the location of the double check assembly. Note: the location of the double check assembly shall be available to employees of Tucson Water for inspection at all times. Reference Section 103.2.3, UPC 2003.
3. Provide equipment data for the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 2003.
4. Provide CW shut off valves for the building entrance. Reference Section 605.2, UPC 2003.
5. Resolve variations in the plumbing fixtures for the men's restroom (108) as shown on sheets A0.01 and P-1 (WC, urinal, lavatory, and shower) with the fixtures shown on sheet A0.07, (WC, lavatory, and shower), Reference Section 103.2.3, UPC 2003.
6. Resolve variations in the layout of the plumbing fixtures for the women's restroom (107) as shown on sheet A0.01 and P-1, with the fixture layout shown on sheet A0.07. Reference Section 103.2.3, UPC 2003.
7. Provide a floor drain in the men's restroom. Reference Section 412.2, UPC 2003.
8. Show how the temperature of the hot water supply to the public lavatories is controlled. Reference Section 414.1, UPC 2003 and Section 804.3, IECC 2003.
9. Termination of the excess pressure relief from the water heater over an elevated service sink is not approved location. Reference Section 608.5, UPC 2003.
10. Provide water pressure and water pipe sizing calculations that justify serving two water closets, a lavatory, a flush-valve urinal, a shower, and two hose bibbs with a ¾" pipe. Clarify the pipe sizes shown; one pipe is called out as both a 1" and a ¾" pipe. Reference Section 610.1, UPC 2003.
11. Clarify the size of the supply pipe to the urinal. The specified flush valve has a 1" inlet. Reference Section 610.1, UPC 2003.
12. Provide upper terminal cleanouts on horizontal drainage pipes exceeding 5 feet in length (horizontal drain lines serving sinks and urinals require cleanouts regardless of length). Reference Section 707.4, UPC 2003.
13. Provide information to show that the "open site drain" complies with Sections 412.1 and 804.1, UPC 2003.
14. Indicate the minimum slope of the building drain and the building sewer Reference Sections 708.0 and 718.1, UPC 2003.

Final Status

Task End Date Reviewer's Name Type of Review Description
10/19/2006 SUE REEVES OUT TO CUSTOMER Completed