Permit Review Detail
Review Status: Completed
Review Details: POST 3RD PARTY REVIEW
Permit Number - T06CM00288
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/06/2006 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Revise the site drawing to show the size and route of the building water supply along with the location and size of both the water meter and the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 2003. 2. Provide equipment data for the reduced pressure backflow preventer assembly. Reference Section 103.2.3, UPC 2003. |
| 07/06/2006 | MARTIN BROWN | FIRE | REVIEW | Denied | 1) Please add the following automatic sprinkler criteria to the plans: a. The hazard classification of the occupancy including any special hazards. b. The design standard to be used. c. The availability and adequacy of the water supply. d. The design density and the area of operation. 2) No backflow preventer on Fire Service 3) Pleaase provide designation of occupancy classifications for various areas of the building. |
| 07/07/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | need 8th floor review of connection/method to public sewer. |
| 07/13/2006 | LAITH ALSHAMI | ENGINEERING | REVIEW | Denied | Laith Alshami, Engineering and Floodplain Review, 07/13/2006. The project can not be approved at this time. The Site Plan has not been approved yet. |
| 07/24/2006 | BETSY COTTLE | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Completed | 18,325 sf new warehouse development plan D06-0021 not approved by 10.1.06 SED (district) |
| 08/25/2006 | STEVE SHIELDS | ZONING | REVIEW | Denied | 08/25/06 Development Services Department Zoning Review Section Steve Shields Lead Planner Comments: T06CM00288 - Building plan review 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped sit/development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. 4. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the building plan can be approved by Zoning. Two copies of the approved site/development plan, landscape and NPPO plans are to be submitted with the building plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the site plans packet processed together for site approval. If you have any questions about this transmittal, please call Steve Shields, (520) 791-5608 ext. 1180. C:\planning\building\t06cm00288.doc |