| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/15/2006 | ROBERT SHERRY | WATER | REVIEW | Denied | 1. Reduced pressure backflow prevention assemblies are required at the water meter for multi-use commercial buildings. Reference COT Ordinance 9976, http://www.tucsonaz.gov/water/docs/backflow-ord.pdf 2. Tucson Water indicates that the minimum water pressure at the address ranges from 83 to 90 PSI. Provide a pressure-reducing valve for the water service. Reference Section 608.2, UPC 2003. |
| 12/18/2006 | MARTIN BROWN | FIRE | REVIEW | Approved | |
| 12/20/2006 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | A site application card (yellow card) with the CDRC approved development plan must be stamped with signatures for DSD site approval by the following reviewing sections; Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO. Provide two copies of the approved development plan, landscape and NPPO plans with the approved building plan set. The development plan may be walked through for stamps and site card sign off. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. |
| 12/20/2006 | TERRY STEVENS | ZONING | REVIEW | Denied | 12/20/06 Development Services Department Zoning Review Section Terry Stevens Lead Planner Comments: 1. The building plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed. 2. Zoning could not verify that the building plan was in compliance with the approved development plan. Please submit two copies of the approved and stamped development, landscape, and NPPO plans with the next building plan submittal. 3. Zoning will re-review the building plan on the next submittal to insure compliance with the approved site/development plan. Additional comments may be forthcoming. 4. A site card with DSD approvals by Fire, Zoning, Handi-cap, Engineering, and Landscape/NPPO including the approved development plan stamped for site plan approval and signatures is required before the building plan can be approved by Zoning. Two copies of the approved development plan, landscape and NPPO plans are to be submitted with the building plans packet for processing and approval as a site plan. No fees are involved in re-stamping the development/tentative plat plans as an approved site plan. The development plan may be walked through for stamps and site card sign off. Submit the following: two copies of the stamped development plan, landscape and NPPO plans must be included with the building plans packet processed together for site approval |
| 12/28/2006 | GERRY KOZIOL | WWM | REVIEW | Denied | needs to show location /method of connection to public sewer |
| 12/29/2006 | SUE REEVES | COMMERCIAL IMPACT FEE | COMMERCIAL IMPACT FEE PROCESSING | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/22/2007 | FSANCHE1 | OUT TO CUSTOMER | Completed |
| 02/22/2007 | SUE REEVES | REJECT SHELF | Completed |