| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/08/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
| 09/08/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. The applicable code for all commercial plumbing projects is the 1994 Uniform Plumbing Code with Arizona State Amendments. 2. Provide an additional cleanout for the existing building sewer (maximum spacing of 100 feet) per Section 719.1, UPC 1994. 3. Specify the materials to be used for the water piping and fittings. Reference Section 604.1, UPC 1994. |
| 09/08/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 09/08/2005 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 09/15/2005 | DAN CASTRO | ZONING | REVIEW | Denied | Building plans may not be approved by the Zoning Review Section prior to site plan approval and building plan approval by Structural Review. |
| 09/26/2005 | GERRY KOZIOL | WWM | REVIEW | Denied | needs wastewater-iwc-Tom Tomchak-review of oil & sand separator- 579-5771. need WW/8th floor, Ilene Deckard review- future lot split will change address and require joint use agreements. |
| 09/29/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | |
| 10/05/2005 | PATRICIA GILBERT | ENGINEERING | REVIEW | Denied | Approved site plan required prior to building plan approval. |
| 10/11/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 10/11/05 ACTIVITY NUMBER: T05CM04557 PROJECT NAME: Truck wash canopy PROJECT ADDRESS: 6667 S. Tucson Blvd. ARCHITECT / ENGINEER: James Harrington PROJECT REVIEWER: Christy Foreman TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1) Demolition permit must be purchased for existing building, concrete pad, canopy, and metal shed. 2) Provide a completed code analysis justifying seperated / non-seperated use (302.3.1) , therefore clarifying if fire seperation is required between buildings. 3) Special Inspection forms must be submitted before a permit can be issued. 4) Site plan must be approved before the building permit can be approved. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/20/2005 | JMORALE1 | OUT TO CUSTOMER | Completed |
| 10/20/2005 | SUE REEVES | REJECT SHELF | Completed |