Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: OTHER
Permit Number - T05CM02493
Review Name: OTHER
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
09/15/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | T05CM02493 7/15/05 1. HVAC Equipment Schedule specifies 230V equipment. Electrical service is 208V without transformation. Please clarify. 2. AC Unit #3 is specified as 3-phase on HVAC Equipment Schedule. The unit is on a 2-pole CB. Coordinate with Mechanical and clarify. 3. Loads listed on new Panel A from existing Panel C do not correspond to the totals on Panel Schedule C. Furthermore, the totals on Phases A and B on Panel C appear to be 17175 VA and 15300 VA, respectively. 4. Existing equipment on 240V panel may not be suited for 208V. 5. Provide available fault current at Panel C. 6. Per NEC Table 250.66, 500 MCM Cu takes a 1/0 Grounding Electrode Conductor, not #2. |
09/15/2005 | GBONILL1 | BUILDING-COMMERCIAL | REVIEW | Denied | |
09/15/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide ventilation for the restrooms per Section 403.3, IMC 2000. 2. Provide duct insulation per Section 803.2.8, IECC 2000. |
09/15/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
12/01/2005 | GBONILL1 | OUT TO CUSTOMER | Completed |