Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T05CM00922
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/08/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
03/14/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT Linda.Buczynski@tucsonaz.gov IF YOU CARE TO DISCUSS. 1. Non-metallic sheathed cable not approved for this application. Reference NEC 334.10 (3) and 527.4 (B). Suggest the use of flexible metallic conduit. 2. It appears that there is a spurious note by Grid Point G-6. Repeats the one directly below and no arrowhead. 3. Sheet E-1 fuse size for Temporary Cooling Tower is listed as 17.5 A. Could the intent be to provide a 15AF. |
03/25/2005 | CHRISTY FOREMAN | BUILDING-COMMERCIAL | REVIEW | Denied | CITY OF TUCSON DEVELOPMENT SERVICES STRUCTURAL REVIEW COMMENTS DATE: 3/29/05 ACTIVITY NUMBER: T05CM00922 PROJECT NAME: Replace Cooling Tower PROJECT ADDRESS: 101 N. Stone Ave. ARCHITECT / ENGINEER: Schneider & Assoc. Engineers PROJECT REVIEWER: Christy Foreman TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1108 OR EMAIL AT CFOREMA1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1) Clarify dead loads for new equipment drawing S1 and structural calculations contradict each other. 2) Sht. 7 structural calculations summary states column is under reinforced. Justify existing columns can carry new loads. 3) Dimension S1 drawing - Clarify support system carrying load to the ground. |
04/04/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
04/04/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | Revise the drain from the temporary location of the cooling tower to terminate over an indirect waste receptor instead of a direct connection. Reference Section 801.1, UPC 1994. |
04/04/2005 | ROBERT SHERRY | WATER | REVIEW | Approved |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/08/2005 | DELMA ROBEY | OUT TO CUSTOMER | Completed |