Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM05376
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/04/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Limit the water velocity to less than 8 fps for the copper piping (e.g. HWR). Reference Section A 6.1, UPC 1994 and IAPMO IS 3-93, Section 610.0. 2. Coordinate the waste & vent riser diagram with the plumbing floor plan. |
02/04/2005 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Approved | |
02/07/2005 | JIM EGAN | FIRE | REVIEW | Approved | |
02/09/2005 | CAGUILA1 | WWM | REVIEW | Needs Review | |
02/09/2005 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | TO4CM05376 DENIED 2/7/05 1. On Plans WH is indicated to be on Ckt 33-34-36. Please correct to 32-34-36 per panel schedule. 2. WH is 18 KW 3-phase 50 A per Electrical Schedule Sheet E1.1. Is 60 KW single phase 28.8 a per Sheet P2. Please coordinate with Mechanical and clarify. 3. Plumbing references RCP-1 Recirc Pump on Shts P1 and P2. Please provide electrical power. 4. Suggest a re-evaluation of the 60 AF at the HP disconnect, considering that it is protected upstream by a 50 A CB. |
02/09/2005 | CAGUILA1 | BUILDING-COMMERCIAL | REVIEW | Needs Review |