Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Parcel Search

 
Parcel Attributes
Parcel141148150
JurisdictionTucson
City of Tucson ZoningC-1
Tucson WardWard 4
Tucson Registered NeighborhoodRita Ranch
Major Streets & Routes

Arterial or Collector

,

Gateway Route

,

Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses

Annexations & Original City Zoning (OCZ)

Date - 11/23/2024 7:09 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-64-84 Area 7 6142 01/17/1985 6143

Special Development Requests & Requirements

Date - 11/23/2024 7:09 a.m.
Total Number Of Special Development Permits - (7)
Activity Number Status Apply Date Expired Date Type Description
H000000320 Closed N/A
H000001744 Closed N/A
H000001745 Closed N/A
H000001746 Closed N/A
T08SA00349 Void N/A
T10SA00199 Closed N/A LIQUOR MITIGATION PLAN FOR RESTAURANT WITH NEW PATIO EXPANSION LOCATED WITHIN 300 FEET OF RESIDENTIAL (SUBURBAN RANCH - SR) ZONING.
T17SA00017 Complete N/A

Permits

Parcel Number - 141148150
Date - 11/23/2024 7:09 a.m.
Total Number Of Permits - (488)
Permit Permit Status Entered Date Expired Date Unit Type Description
T20OT00015 Submitted 01/03/2020 N/A 112 Sign - Annual Portable BANNER 45 DAYS
TZ-CMP-0124-00002 Complete 01/03/2024 N/A Zoning Compliance Zoning Confirmation Letter for Safeway at 9050 East Valencia Road
T18OT00030 Expired 01/08/2018 10/10/2018 112 Sign - Annual Portable 7 LOCATIONS IN TUCSON 9040 E VALENCIA / 1570 E TUCSON / 8110 S HOUGHTON RD. / 3225 E SWAN RD / 8004
TS-PRM-0123-00155 Complete 01/26/2023 03/23/2024 Sign - Permanent One wall sign with illuminated pan channel letters
T22OT00114 Expired 02/15/2022 08/14/2022 172 Sign - Permanent 1-illum wall sign
TF-FOP-0423-00811 Complete 04/05/2023 07/06/2023 Fire Operational Permit INDOOR RETAIL FIREWORKS SALES 131#
TF-FOP-0424-00517 Complete 04/26/2024 07/07/2024 Fire Operational Permit Retail sales - CFW - special event vendor
TF-FOP-0524-00629 Complete 05/24/2024 07/07/2024 Fire Operational Permit TNT CFW sales - special events organizer
TF-FOP-0524-00638 Complete 05/29/2024 07/07/2024 Fire Operational Permit TNT CFW sales - Tent - Special event vendor
TF-FCP-0624-00411 Inspections 06/01/2024 12/14/2024 Fire Construction Permit Upgrade of existing commercial kitchen hood fire suppression system to protect new equipment being installed under the hood.
T22OT00424 Expired 06/09/2022 05/05/2023 106 Sign - Permanent 1-ILLUM WALL SIGN
T19OT00703 Issued 07/30/2019 09/14/2019 112 Sign - Annual Portable 45 DAY BANNER EXP ON SEPT 14 2019
T22RW03219 Complete 09/06/2022 11/13/2022 Right-of-Way (ROW) EXCAVATE APPROX A 176’X5’ & 90’X5’ TRENCHES IN ASPHALT TO REPLACE GAS MAIN AT 9040 E VALENCIA RD. EX; Work Order: 4468479
TS-PRM-0924-00423 Issued 09/25/2024 03/24/2025 UNIT 112 Sign - Permanent Installation and manufacture of 1 illuminated wall sign
D00-0062 Canceled 10/04/2000 12/03/2001 Development Package RITA RANCH RETAIL CENTER
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 1 UNIT 1208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 10 UNIT 10208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 11 UNIT 11308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 12 UNIT 12308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 13 UNIT 13308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 14 UNIT 14308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 15 UNIT 15308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 16 UNIT 16308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 17 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 18 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2301 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2302 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2303 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2304 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2305 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2306 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2307 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 2 UNIT 2308 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 3 UNIT 3208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 4 UNIT 4208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 5 UNIT 5208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 6 UNIT 6208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 7 UNIT 7208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 8 UNIT 8208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9101 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9102 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9103 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9104 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9105 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9107 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9108 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9201 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9202 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9203 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9204 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9205 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9206 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9207 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 BLDG 9 UNIT 9208 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 100 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 106 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 110 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 112 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 118 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 120 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 124 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 130 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 136 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 140 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 142 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 150 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 160 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 166 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 172 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 178 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 184 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 188 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TR-ROW-1123-01353 Complete 11/14/2023 12/27/2023 UNIT 196 Right-of-Way (ROW) Air-Vacuum excavation of 12 utility potholes for the design phase of Tucson DOT Valencia Road: Kolb Road to Houghton Road project
TF-FOP-1122-00108 Complete 11/17/2022 05/17/2023 Fire Operational Permit INDOOR RETAIL SALES OF STATE PERMISSIBLE FIREWORKS.
TF-FOP-1223-01893 Complete 12/07/2023 01/03/2024 Fire Operational Permit INDOOR RETAIL SALE
T04BU02561 Closed 10/19/2004 04/20/2005 SPKLR FIRE SPRINKLER:ADD 2 RELOCATE 2
T04CM05376 C of o 12/14/2004 01/24/2006 #172 COMBO TI:ICE CREAM SHOP
T04OT01955 Final 09/28/2004 05/08/2005 SIGN SIGN:7844 US BANK #1986
T05AN00637 Void 06/13/2005 N/A #196 ADDRNEW
T05AN00652 Issued 06/15/2005 N/A #188 ADDRNEW
T05BU01230 Final 05/18/2005 11/15/2005 #172 SPKLR FIRE SPKR: RELOCATE 4
T05CM02730 C of o 06/14/2005 03/06/2006 #196* COMBO TI:RESTAURANT
T05CM05879 Si_xpire 11/23/2005 01/23/2007 COMBO TI: RETAIL
T05OT00331 Final 02/14/2005 01/23/2006 #172 SIGN SIGN: 8510 SCOOP'S
T05OT02083 Final 08/22/2005 02/20/2006 #196* SIGN SIGN: 9564 KYO SUSHI
T05OT02552 Final 10/13/2005 11/19/2006 #196* SIGN SIGN:# 9881
T06BU00977 Final 04/24/2006 01/10/2007 SPKLR SPRINKLER:
T06BU01416 Final 06/06/2006 12/04/2006 BUILD PRE PACKAGED FIRE SUPPRESSION SYSTEM
T06BU01628 Final 06/22/2006 12/26/2006 BUILD KITCHEN EXHAUST HOOD FIRE SUPPRESSION SYSTEM
T06OT00669 Final 03/09/2006 08/25/2008 #172 SIGN 10784
T06OT01884 Final 07/18/2006 02/17/2007 SIGN 11508
T06OT01885 Final 07/18/2006 03/04/2007 SIGN 11509
T06OT01886 Final 07/18/2006 01/30/2007 SIGN 11510
T07OT01129 Final 05/11/2007 12/22/2007 #112 SIGN 13111
T08AN00993 Issued 12/12/2008 N/A #118 ADDRNEW
T08BU01932 Final 10/30/2008 05/03/2009 SPKLR Add 2 fire sprinkler heads.
T08CM02958 C of o 09/03/2008 06/22/2009 #136 COMBO TI: RESTAURANT
T08CM03439 C of o 10/21/2008 08/31/2009 #118 COMBO TI: ANIMAL SERVICES
T08EL01259 Final 07/07/2008 02/17/2009 ELECT SERVICE REPAIR
T08OT01057 Final 05/01/2008 12/13/2008 SIGN 14914
T08OT01058 Expired 05/01/2008 05/03/2010 SIGN 14913
T08OT01131 Final 05/09/2008 12/21/2008 #112 SIGN 14962
T08OT02727 Final 11/18/2008 06/13/2010 SIGN 15922
T08OT02808 Final 11/26/2008 09/01/2009 #136 SIGN 15973
T08OT02931 Final 12/16/2008 09/05/2009 #118 SIGN 16049
T09BU00195 Final 02/09/2009 08/17/2009 #118 SPKLR Add 12, relocate 20 fire sprinklers
T09BU01355 Final 09/10/2009 05/08/2010 #196* SPKLR Relocate 2 fire sprinklers
T09CM00107 Expired 01/15/2009 01/11/2010 COMBO ADD: EXTERIOR AWNING, BASIC FACADE WORK, EXTERIOR ELECTRICAL LIGHTS
T09OT00072 Final 01/14/2009 08/30/2009 #112 SIGN 16162
T09OT00112 Final 01/20/2009 07/28/2009 #118 SIGN 16188
T09OT00795 Final 04/23/2009 01/16/2010 #100 SIGN 16566
T09OT01116 C of o 06/02/2009 12/05/2009 #100 C-OF-O C OF O:RESTAURANT
T09OT02142 Closed 10/06/2009 05/30/2010 SIGN 17307
T09OT02750 C of o 12/17/2009 06/21/2010 #106 C-OF-O C OF O:RETAIL
T09OT02779 Final 12/22/2009 07/11/2010 SIGN 17680
T09OT02813 Final 12/29/2009 08/16/2010 #106 SIGN 17705
T09OT02814 Expired 12/29/2009 07/06/2010 #106 SIGN 17704
T10CFW0038 Closed 12/09/2010 06/07/2011 FIREWRKS APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE*CONTACT TFD 791-4502 FOR THE REQUIRED INSPECTION
T10OT00086 Final 01/12/2010 08/29/2010 #112 SIGN 17778
T10OT00494 Final 03/05/2010 09/18/2010 #118 SIGN 18005
T10OT01621 Final 07/29/2010 03/14/2011 #112 SIGN 18703
T10OT02703 Final 12/22/2010 08/22/2011 #112 SIGN BANNER 45DAYS START: 01/05/11 END: 02/19/11
T11BU00845 Final 06/22/2011 12/24/2011 TENTS TENT FOR FIREWORKS
T11BU01021 Final 08/03/2011 03/06/2013 SPKLR Add 5 fire sprinklers
T11BU01249 Expired 09/27/2011 04/03/2012 SPKLR RELOCATE ONE FIRE SPRINKLER.
T11CFW0034 Final 05/17/2011 11/13/2011 FIREWRKS APPROVED FIREWORKS PERMIT FOR SALE & STORAGE
T11CFW0102 Final 06/22/2011 12/24/2011 FIREWRKS FIREWORKS
T11CFW0117 Final 12/05/2011 06/02/2012 FIREWRKS APPROVED FIREWORKS PERMIT FOR SALE & STORAGE
T11CM02022 Final 06/29/2011 03/06/2013 COMBO TI; PHARMACY
T11CM03176 C of o 10/04/2011 06/13/2012 #100 COMBO TI: EL CORONADO RESTAURANT
T11OT01466 Final 07/26/2011 03/18/2012 #112 SIGN BANNER 45 DAYS 7-25-2011 THRU 9-14-2011
T12BU00315 Final 03/07/2012 10/01/2012 BUILD FIRE ALARM
T12BU01492 Expired 12/18/2012 06/16/2013 TENTS TENT
T12CFW0041 Final 05/09/2012 11/05/2012 FIREWRKS APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE: CONTACT TFD 791-4502
T12CFW0074 Final 11/23/2012 05/22/2013 FIREWRKS APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE:CONTACT TFD 791-4502 FOR REQUIRED INSPECTION
T12CFW0128 Final 12/11/2012 11/02/2013 FIREWRKS FIREWORKS
T12OT00059 Final 01/11/2012 08/26/2012 SIGN BANNER:45 DAYS 01-11-2012 - 02-26-12
T12OT01117 Final 07/27/2012 03/11/2013 SIGN BANNER:45 DAYS 07-27-2012 - 09-10-12
T12OT01327 Expired 09/13/2012 03/17/2013 #178 SIGN 1- ILLUM WALL SIGN 20738
T13CFW0027 Final 05/07/2013 11/03/2013 FIREWRKS *APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE* CONTACT TFD 791-4502 FOR THE REQUIRED INSPECTIONS
T13CFW0117 Final 12/12/2013 06/10/2014 FIREWRKS *APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE* CONTACT TFD 791-4502 FOR THE REQUIRED INSPECTIONS
T13CM02054 C of o 04/09/2013 11/02/2013 #196 COMBO TI: PET GROOMING
T13CM05154 Final 08/21/2013 03/12/2014 #172 COMBO TI: COMM
T13CM06987 L of c 11/18/2013 09/30/2014 #142 COMBO TI: RETAIL
T13OT00006 Final 01/03/2013 08/20/2013 #112 SIGN BANNER - 45 DAY 01/04/13 THRU 02/18/13
T13OT00562 Expired 05/09/2013 11/11/2013 #196 SIGN 1- ILLUM. WALL SIGN 21226
T13OT00883 Final 07/29/2013 03/16/2014 #112 SIGN 45 DAY BANNER 07/31/13 THRU 09/14/13
T13OT01067 Expired 09/09/2013 08/20/2014 #172 SIGN 1- ILLUM WALL SIGN
T13OT01069 Void 09/10/2013 N/A #172 SIGN SIGN
T14BU00112 Final 01/29/2014 08/24/2014 #142 SPKLR FIRE SPRINKLER
T14CFW0004 Final 05/09/2014 11/05/2014 FIREWRKS *APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE* CONTACT TFD 791-4502 FOR THE REQUIRED INSPECTIONS
T14CFW0094 Final 12/03/2014 06/01/2015 FIREWRKS *APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE* CONTACT TFD 791-4502 FOR THE REQUIRED INSPECTIONS
T14OT00016 Final 01/06/2014 02/21/2014 #112 SIGN BANNER - 45 DAYS 01/07/2014 THRU 02/21/2014
T14OT00213 Expired 02/18/2014 08/19/2014 #142 SIGN 2- IDENTICAL ILLUM WALL SIGNS ON THE N. & E. ELEVS
T14OT00493 Expired 04/21/2014 10/27/2014 #100 SIGN AFRAME ON PRIVATE PROPERTY (12' SETBACK)
T15BU00373 Expired 04/06/2015 11/03/2015 #184 BUILD HOOD EXHAUST SYSTEM
T15BU00730 Expired 06/25/2015 12/28/2015 #184 BUILD FIRE ALARM
T15CFW0028 Final 05/01/2015 10/28/2015 FIREWRKS *APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE* CONTACT TFD 791-4502 FOR THE REQUIRED INSPECTIONS
T15CFW0098 Final 11/25/2015 05/23/2016 FIREWRKS *APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE* CONTACT TFD 520-791-4502 FOR THE REQUIRED INSPECTIONS.
T15CM01347 L of c 03/02/2015 11/10/2015 #188 COMBO REMODEL EXISTING RESTAURANT
T15CM04339 Withdrwn 06/25/2015 N/A #184 COMBO TI: RESTAURANT
T15OT00454 Expired 04/03/2015 10/13/2015 #188 SIGN 1- ILLUM WALL SIGN
T15OT00630 Closed 05/08/2015 02/13/2016 #112 SIGN BANNER 05/14/15-08/12/2015
T15OT00661 Withdrwn 05/14/2015 N/A #188 C-OF-O C OF O
T16CFW0027 Final 05/16/2016 11/12/2016 FIREWRKS *APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE* CONTACT TFD 791-4502 FOR THE REQUIRED INSPECTIONS
T16CFW0096 Final 11/30/2016 N/A FIREWRKS APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE IN BUILDING. CONTACT TFD 791-4502 FOR THE REQUESTED INSPECTIONS.
T16CFW0097 Final 12/01/2016 N/A FIREWRKS APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE IN BUILDING. CONTACT TFD 791-4502 FOR THE REQUESTED INSPECTIONS.
T16CM05215 C of o 07/06/2016 01/09/2017 #160 COMBO RETAIL SMOKE SHOP
T16OT00007 Closed 01/05/2016 02/11/2017 #112 SIGN 45DAY BANNER 01/05/16 - 02/19/16
T16OT00887 Expired 07/21/2016 01/17/2017 #160 SIGN 1- ILLUM WALL SIGN
T16OT00895 Expired 07/22/2016 03/13/2017 #112 SIGN banner
T17CFW0027 Final 05/04/2017 01/01/2018 FIREWRKS APPROVED FIREWORKS PERMIT FOR SALE AND STORAGE IN BUILDING. APPROVED TFD SIGNAGE MUST BE POSTED. CONTACT TFD 791-4502 FOR THE REQUESTED INSPECTIONS PRIOR TO BEGINNING SALES.
T17CFW0103 Final 12/05/2017 07/06/2018 FIREWRKS FIREWORKS
T17OT00006 Closed 01/03/2017 08/20/2017 #112 SIGN 45 banner permit exp 2/18/2017
T17OT00762 Closed 07/25/2017 09/24/2018 #112 SIGN BANNER 45 DAYS
T18CFW0023 Final 05/03/2018 01/01/2019 FIREWRKS FIREWORKS
T18CFW0096 Final 11/20/2018 06/22/2019 FIREWRKS FIREWORKS PERMIT- TNT DATE OF EVENT: 12.10.18- 01.03.19 SAFEWAY 520-663-0009
T18OT00795 Final 07/23/2018 04/02/2019 #112 SIGN 45 day banner expires on Sept 8th 2018
T18OT01190 Final 11/16/2018 07/17/2019 #100 SIGN 1-ILLUM WALL SIGN
T19CFW0025 Final 04/23/2019 12/31/2019 FIREWRKS FIREWORKS 520-663-0009
T19CFW0096 Final 12/02/2019 07/04/2020 FIREWRKS TNT CONSUMER FIREWORKS 12/18-01/03
T19CM09057 L of c 12/11/2019 07/21/2020 COMBO INTERIOR DEMO - US BANK IN SAFEWAY
T19FC00007 Final 01/03/2019 07/07/2019 #100 FIRECONS RE-PIPE EXISTING FIRE SYSTEM
T19OT00006 Closed 01/04/2019 10/20/2019 #112 SIGN 45 DAY pennant EXP ON February 23, 2019
T19OT00657 Final 07/16/2019 01/22/2020 #166 SIGN 1-ILLUM WALL SIGN
T19RW06374 Final 10/22/2019 12/25/2019 ROW 722' FT OF BORE,16 SQFT OF CONCRETE REMOVAL/REPLACEMENT AND PLACEMENT OF HH. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 FOR COORDINATION.
T20CFW0001 Final 05/12/2020 12/29/2020 FIREWRKS Fireworks- Consumer at Safeway 1986 05/20-07/06/2020
T20CFW0105 Final 11/30/2020 06/29/2021 FIREWRKS SAFEAY TNT FIREWORKS 12/10-01/03/2021
T20CM06193 Revoked 09/10/2020 04/12/2021 COMBO COOKING OIL SYSTEM, LINES & FILL BOX
T20FC00037 Final 01/16/2020 07/19/2020 FIRECONS *** NO PLANS *** Relocate Two Pendants
T21CFW0038 Final 05/17/2021 12/18/2021 FIREWRKS CONSUMER FIREWORKS- TNT FIREWORKS SAFEWAY #1986 520-663-0009
T21CFW0098 Final 12/06/2021 06/19/2022 FIREWRKS CONSUMER FIREWORKS - SAFEWAY 1986 - 9050 E VALENCIA RD (520)663-0009
T21CM05141 Final 06/21/2021 03/29/2022 COMBO TI:SAFEWAY (T21DV01801)
T21FO00018 Final 01/07/2021 09/28/2021 FIREOPER SAFEWAY INC
T21FO00021 Void 01/12/2021 01/12/2022 FIREOPER SAFEWAY 267
T22CFW0027 Final 04/25/2022 10/30/2022 FIREWRKS CFW 5/9/22 TO 7/6/22 - SAFEWAY #1986 - 9050 E VALENCIA RD

Code Enforcement

Parcel Number - 141148150
Date - 11/23/2024 7:09 a.m.
Total Number Of Code Cases - 37
Case Number Case Status Entered Date Closed Date Unit Type Description
T05FR00221 Complete 02/09/2005 N/A FIREINSP ALARM SYSTEM O/S SINCE 9/25/04.
T05FR00945 Complete 06/22/2005 N/A #160 FIREINSP self inspection program
T06FR00247 Field 02/28/2006 N/A FIREINSP full insp" SIP
T06FR01149 Complete 05/03/2006 N/A FIREINSP self inspection program.
T07FR00989 Complete 05/22/2007 N/A FIREINSP Full Inspection
T07FR01012 Field 05/25/2007 N/A FIREINSP Full Inspection
T07FR02266 Complete 11/08/2007 N/A FIREINSP F/U on Complaint
T08FR00303 Complete 01/28/2008 N/A #142 FIREINSP General Inspection
T08FR00305 Complete 01/29/2008 N/A FIREINSP Code Violation
T08FR00306 Complete 01/29/2008 N/A #160 FIREINSP General Inspection
T08FR00307 Complete 01/29/2008 N/A #166 FIREINSP General Inspection
T08FR00317 Complete 01/31/2008 N/A #178 FIREINSP General Inspection
T08FR00318 Complete 01/31/2008 N/A #172 FIREINSP General Inspection
T08FR00335 Complete 02/04/2008 N/A #136 FIREINSP General Inspection
T08FR00355 Complete 02/04/2008 N/A #188 FIREINSP General Inspection
T08FR00372 Complete 02/05/2008 N/A #130 FIREINSP General Inspection
T08FR00373 Complete 02/05/2008 N/A #118 FIREINSP General Inspection
T08FR00391 Complete 02/07/2008 N/A #112 FIREINSP General Inspection
T08FR00501 Complete 02/19/2008 N/A #106 FIREINSP General Inspection
T09FR00297 Complete 01/22/2009 N/A #166 FIREINSP SELF INSPECTION PROGRAM
T09FR00341 Complete 01/26/2009 N/A #160 FIREINSP SELF INSPECTION PROGRAM
T09FR01397 Complete 04/23/2009 N/A #178 FIREINSP SELF INSP
T09FR01516 Complete 05/01/2009 N/A FIREINSP Full Fire Inspection
T09FR01827 Complete 05/29/2009 N/A FIREINSP 2 B-range not protected, report in log book
T09FR02128 Complete 06/29/2009 N/A FIREINSP FIRE ALARM SYSTEM COMPLAINT
T10DV01735 Noverify 03/30/2010 N/A DNR_VIOL VALENCIA ANIMAL HOSPITAL HAS A ILLEGAL A-FRAME SIGN NEAR SIDEWALK WITH BALLOONS TIED TO IT.
T10FR00812 Complete 04/27/2010 N/A FIREINSP Self Inspection
T10FR00992 Complete 05/17/2010 N/A #160 FIREINSP Self inspection prgram
T10FR01357 Complete 07/15/2010 N/A FIREINSP DISCREPANCIES - CINTAS
T10FR02658 Complete 12/16/2010 N/A FIREINSP FIREWORKS INSPECTION
T14DV04879 Complian 07/16/2014 N/A DNR_VIOL 1 FEATHER BANNER (EL CORONADO RESTAURANT)
T14DV07272 Complian 09/12/2014 N/A DNR_VIOL illegal signs - one feather banner, one banner hanging from canopy and without permit. One A- frame sign that is legally permitted and appears to have proper size and placement but has an illegal paper attachment. PRO to feather banner.
T14DV08145 Complian 09/30/2014 N/A DNR_VIOL Sign
T15DV00303 Complian 01/20/2015 N/A DNR_VIOL sign violation
T15DV05560 Complian 07/28/2015 N/A #184 DNR_VIOL Happy Wok in Unit #184 has a new banner dangling down from the storefront overhang.
T18DV03274 Noverify 06/07/2018 N/A DNR_VIOL : Abandoned Diesel trailer
T21DV01801 Complian 04/01/2021 N/A DNR_VIOL Work without permits - TFD found second consultation room in pharmacy area not on the approved 2011 Plans for TI.