Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: T04CM04336
Parcel: 140430130

Review Status: Completed

Review Details: POST 3RD PARTY REVIEW

Permit Number - T04CM04336
Review Name: POST 3RD PARTY REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/03/2005 Jim Egan FIRE REVIEW Denied 1. Fire service water lines cannot belocated under building foundations, concrete slabs, or drainage basins.
2. Fire hydrants cannot be supplied from 4-inch water mains.
3. Provide complete site plan indicating fire apparatus access roadways and existing fire hydrant locations.
01/03/2005 ROBERT SHERRY WATER REVIEW Approved
01/05/2005 Gerry Koziol WWM REVIEW Approved
01/11/2005 ELIZABETH EBERBACH ENGINEERING REVIEW Denied SUBJECT: 1151 E. Hermans Rd. Raytheon Cafeteria - Post-3rd party submittal
DATE: 11 January 2005
ACTIVITY NUMBERS: T04CM004336
T15S R14E SEC 19

Engineering Division has reviewed the Subject package and approval is not recommended at this time. A Site/Grading Review will be required for this proposed development, as may a floodplain use permit. Please submit two copies of a drainage report with three copies of grading plans, a grading permit application, and a "Site Review Record" with a resubmittal package, at a minimum. A floodplain Use Permit Application must also be included if there are any regulatory watercourses (flows of 100 cfs or greater during the 100-year storm event) that may be affected by this proposed development. A Floodplain Use Permit will be required is so. Please include three (3) sets of Stormwater Pollution Prevention (SWPP) plans with text if the proposed area of disturbance is greater than an acre, or part of a larger common plan.

The drainage report must contain at a minimum the drainage report content requirements listed in Section 2.3.1 of Development Standard 10-02.0 (City of Tucson's Standards Manual for Drainage Design and Floodplain Management), and shall reflect any master drainage design that may be contained within a master drainage report. Provide/present the report as an addendum to the master report if so, with demonstration of conformance to the master report, if applicable. Balanced Basin Flow attenuation for the 2- 10- and 100-year storm events must be addressed, and the report must show how flows will be conveyed around the proposed building and enter the proposed or existing drainage pipes located at the northwest side of the building. Proposed conveyance of flows under any proposed or existing buildings may not be approved by this office.

If you have any questions, I can be reached at 791-5550, extension 1189 or Doug.williams@tucsonaz.gov
Douglas Williams
Sr. Engineering Associate
Engineering Division
Development Services Department
01/24/2005 David Rivera ZONING REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
01/25/2005 SUE REEVES OUT TO CUSTOMER Completed
01/25/2005 SUE REEVES REJECT SHELF Completed