Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM01256
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/29/2004 | ANY | BUILDING-COMMERCIAL | REVIEW | Denied | SEE COMMENTS ON APPLICATION. |
03/29/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Denied | DENIED 3/29/04 T04CM01256 1. Note 19 on Sheet A00.0 calls for exit signs to be powered from separate circuits. Identify such circuits by panel and circuit number, and add to panel load calculation. 2. Description 17 on Sheet A13.3 calls for and electric hand dryer. Identify the circuit by panel and circuit number, and add to panel load calculation. 3. Light and fan on MEP-1 are powered from A-58,60 according to the Electrical Plan. According to the panel schedule such equipment is on Ckts 58 and 60. Please clarify. 4. WH on MEP-1 is powered from A-62, 64 according to the Electrical Plan. According to the panel schedule such equipment is on Ckts 66, 68. Please clarify. |
03/29/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Use the PUBLIC fixture units from Tables 6-3, UPC 1994 for calculations and sizing. Resize piping as required. 2. Include the floor drain in the fixture calculation table. 3. Provide cleanout for the mop sink. Reference section 707.4 (1), UPC 1994. 4. Show that the installation of the water heater complies with the access requirements of section 511.2, UPC 1994. 5. The mop sink is not an approved termination for the T&P relief from the water heater. Reference Section 608.5, UPC 1994. 4. Revise detail A/MEP-1 to correspond to the fixture units used in the calculations. |
03/31/2004 | CAGUILA1 | WWM | REVIEW | Needs Review | |
03/31/2004 | CAGUILA1 | FIRE | REVIEW | Needs Review |