Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T04CM01223
Review Name: COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/16/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
| 03/16/2004 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 03/16/2004 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 03/16/2004 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Passed | |
| 03/17/2004 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Passed | |
| 03/17/2004 | BLANCA ESPINO | ENGINEERING | REVIEW | Approved | |
| 03/18/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Approved | |
| 03/25/2004 | LLESNY1 | WWM | REVIEW | Passed | |
| 03/25/2004 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | T04CM01223 DENIED 3/16/04 1. New WH is on Ckt 10,12 on floor plan, 9,11 on panel schedule. Please clarify. 2. WH at 3130 VA total draws 13A. Shall be protected by no greater than a 20A CB per NEC 422-11 (e) (2). 3. Provide cut sheets for fixtures A & B, and demonstrate compliance with the Lighting Ordinance. 4. Complete load calculations for the panel. Show how the total load of 56592 watts was obtained. Fill in the information for high leg. 5. Panel is new on Sheet T1.0 Project Description, Existing on panel Schedule, and new on Single Line Diagram. Clarify. 6. CKT 7 on panel schedule has no load, but is a part of CKT 5. Clarify. 7. CKT 1 on panel schedule has no load, but is a part of CKT 3. Clarify. 8. Verify that load test conditions for the clamp-on meter test had all equipment energized. 9. On the Single Line Diagram, Keynote 2, the GND should not be in this run as it consists of a parallel path to ground. 10. On the Single Line Diagram, Keynote 3, 16 circuits are to be fed by the new panel LP. Show these loads by circuit number on such panel. 11. If the AFC was from TEP in writing for this location, state so on the plans. Note that single phase services need direct contact with TEP to verify AFC. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 03/29/2004 | EGRANT1 | OUT TO CUSTOMER | Completed |
| 03/29/2004 | SUE REEVES | APPROVAL SHELF | Completed |