Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: SITE
Permit Number - T03OT02275
Review Name: SITE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/15/2004 | DOUG WILLIAMS | ENGINEERING | REVIEW | Denied | 1. The site plan must depict the detention basin 100-year ponding limits. 2. In accordance with the City of Tucson Standards Manual for Drainage Design and Floodplain Management (SMDDFM), Section 14.3.2 - Development Standard 10-02.0, The following must be completed prior to approval of the Site Plan: Provide a copy of specific maintenance responsibility language associated with the basin easement, with recording information, or provide a note on the plan stating "(a) that the owner or owners shall be solely responsible for the operation, maintenance and liability for drainage structures and the detention basin; (b) that the owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the detention facilties at least once a year, and that these regular inspection reports will be on file with the owner or owners for review by City staff, upon written request; (c) that City staff may periodically inspect the drainage and detention facility to verify that scheduled and unscheduled maintenance activities are being performed adquately, and (d) that the owner or owners agree to reimburse th City for any and all costs associated with maintaining the drainage ad detention facilities, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities". Please note that the inspection reports must contain one of the summaries listed in the SMDDFM, Section 14.3.3. *** Please see grading plan comments under activity # T03BU03181**** |
| 01/20/2004 | ACONNOR1 | NPPO | REVIEW | Denied | 1) A Native Plant Preservation Plan is required Development Standard 10-01.4.3.2 DS 2.15.3.0 Native Plant Preservation Plan Submittal. Per LUC 3.8.4.2 Native Plant Preservation plan approval is required before any site modifications. |
| 01/20/2004 | ACONNOR1 | LANDSCAPE | REVIEW | Denied | A Landscape plan is required. Development Standard 2-15.3.4.B Landscape plans for retention/detention areas are required Stormwater Detention/Retention Manual. 4.3.2 Basin Landscaping. A Landscape is required. Development Standard 10-01.4.3.2 |
| 01/21/2004 | PETER MCLAUGHLIN | HANDICAP-SITE | REVIEW | Passed | |
| 01/21/2004 | JIM EGAN | FIRE | REVIEW | Approved | |
| 01/21/2004 | PETER MCLAUGHLIN | ZONING | REVIEW | Denied | Beth Platt FROM: Peter McLaughlin 209 E. River Road Senior Planner Tucson, AZ 85704 Development Services Dept. (520) 888-8970 FOR: PATRICIA GEHLEN Principal Planner Development Services Dept. PROJECT: T03OT02275 335 E. Elvira Retention/detention easement Site Plan Review (2nd review) TRANSMITTAL: January 21, 2004 Upon completion of the following revisions/additions, an over the counter review may be arranged to obtain stamped approval by the zoning review section without resubmitting the site plan. The following items must be revised on or added to the site plan: 1. Add the existing use of the property (i.e. vacant) to the plan. DS 2-01.2.1.A.31 2. Add the property legal description to the plan. DS 2-02.2.1A.2 If you have any questions about this transmittal, please call Peter McLaughlin, (520) 791-5608 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/23/2004 | LISA LESNY | OUT TO CUSTOMER | Completed |
| 01/22/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |