Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 335 E ELVIRA RD
Search
Parcel Attributes
| Parcel | 13816024D |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | R-2 |
| Tucson Ward | Ward 1 |
| Tucson Registered Neighborhood | Barrio Nopal |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 335 E ELVIRA RD
Date - 12/21/2025 6:01 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 335 E ELVIRA RD
Date - 12/21/2025 6:01 a.m.
Total Number Of Permits - (30)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. | |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01485 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. | |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 1 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 2 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 3 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 4 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 5 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TR-ROW-1223-01487 | Void | 12/29/2023 | N/A | UNIT 6 | Right-of-Way (ROW) | KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps. |
| TC-COM-0425-00768 | Issued | 04/15/2025 | 01/19/2026 | UNIT 2 | Commercial Building | Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting. |
| TC-COM-0425-00769 | Issued | 04/15/2025 | 01/19/2026 | UNIT 3 | Commercial Building | Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting. |
| TC-COM-0425-00770 | Issued | 04/15/2025 | 01/19/2026 | UNIT 4 | Commercial Building | Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting. |
| TC-COM-0425-00771 | Issued | 04/15/2025 | 02/07/2026 | UNIT 5 | Commercial Building | Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting. |
| TC-COM-0425-00772 | Inspections | 04/15/2025 | 02/07/2026 | UNIT 6 | Commercial Building | Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting. |
| TC-RES-0425-01972 | Withdrawn | 04/14/2025 | N/A | UNIT 2 | Residential Building - One or Two Family | Void for wrong permit type - there are six units listed with this parcel so should be commercial addition/alteration permit Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting. |
| TC-COM-0425-00679 | Issued | 04/07/2025 | 01/19/2026 | UNIT 1 | Commercial Building | Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting. |
| T02AN00791 | ISSUED | 08/23/2002 | N/A | ADDRNEW | ||
| T03BU03181 | FINAL | 12/22/2003 | 12/11/2004 | GRADING | BUILD RETENTION/DETENTION BASIN | |
| T03OT00207 | WITHDRWN | 02/10/2003 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
| T03OT02275 | CLOSED | 12/22/2003 | 09/01/2004 | SITE | SITE PLAN FOR RETENTION/DETENTION BASIN | |
| T04BU03045 | FINAL | 12/23/2004 | 11/02/2020 | GRADING | GRADING:88.9CY CUT & 168.41CY FILL | |
| T04OT02511 | CLOSED | 12/23/2004 | 08/03/2005 | SITE | SITE:3 NEW DUPLEXES | |
| T05CM00802 | FINAL | 02/23/2005 | 01/25/2006 | #01 | COMBO | DUPLEX TD#15-74-61 |
| T05CM00803 | FINAL | 02/23/2005 | 01/25/2006 | #03 | COMBO | DUPLEX TD#15-74-61 |
| T05CM00804 | FINAL | 02/23/2005 | 01/25/2006 | #05 | COMBO | DUPLEX TD#15-74-61 |
Record Requests
Address: 335 E ELVIRA RD
Date - 12/21/2025 6:01 a.m.
Total Number Of Requests - (1)
| Request Number | Status | Request Date | Completed Date | Type | Description |
|---|---|---|---|---|---|
| REQ-0425-02524 | Complete | 04/15/2025 | 04/15/2025 | Requests | Void for wrong permit type - there are six units listed with this parcel so should be commercial addition/alteration permit Link to TAA Sound Insulation Project (PR-000143-2025) may include window and door replacement, HVAC system installation and associated electrical work, insulation, and finish carpentry and painting. |