Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL TI
Permit Number - T03CM05695
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/06/2004 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
01/08/2004 | GERRY KOZIOL | WWM | REVIEW | Denied | Needs WW design review of basement lift station - Robert Buecher - Pioneer Bldg - 617-8206 |
01/09/2004 | RANDY SCHULER | HISTORIC | REVIEW | Needs Review | |
01/09/2004 | RANDY SCHULER | DRB | REVIEW | Needs Review | |
12/19/2003 | Robert Sherry | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Reconcile the quantities of plumbing fixtures shown in the Plumbing Fixture Schedule with the number of fixtures and type of fixtures shown on the plans. Reference Section 103.2.3, UPC 1994. 2. Revise the water pressure calculations for each meter to correspond to the actual number of fixtures being served, the total lift for each system, and the developed length for each system. Show all fixtures and water connections (e.g. make up water for chiller and hose bibbs) in the calculations. Revise the pipe sizing as required. Reference Section 610.1, UPC 1994. 3. Provide cleanout for P8 located in room 018. Reference Section 707.4, UPC 1994. 4. Revise riser diagrams 3/P2.1 and 4/P2.1 to coordinate with plumbing plan on P1.1. Reference Section 103.2.3, UPC 1994. 5. Show vent for grease trap on riser diagram 1/P2.3. Reference Section 103.2.3, UPC 1994. 6. If specified grease trap is equipped with an air bypass, a trap is required on the directly connected compartments of the 3-compartment sink. Reference Sections 1011.5 and 1011.8 UPC 1994. Note: the Watts model GI-120-L grease trap is not shown on the Watts web site; provide cut sheet. 7. Provide an upper terminal cleanout near floor sink located in room 205. Reference Section 707.4, UPC 1994 as amended by the State of Arizona. 8. Termination of the excess pressure relief from the water heater (WH-3) over a service sink (P14) is not approved location. Reference Section 608.5, UPC 1994. 9. Show that the gas train for the emergency generator complies with the requirements of NFPA 37. Reference Section 915.2, IMC 2000. |
12/19/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
12/19/2003 | Doug Laakso | BUILDING-COMMERCIAL | REVIEW | Denied | .. T03CM05695 .. 17 W CONGRESS ST .. DGL .. 1/5/04 .. S1. Provide site plan showing property lines of parcel/s involved in this Project, with building/s dimensioned from property lines, per Uniform Administrative Code Sec 302. S2. Provide a Permit Application for each building with work being done as a part of this Project, minimum of (3) three Permit Applications. S3. Provide complete Inspection Program per UAC Sec 302.5. S4. Special Inspection required, As Noted, for : 1. Caissons 2. Site preparation 3. Foundation excavation and compaction 4. Helical pier installation 5. Structural masonry 6. Field welding 7. Concrete 8. Reinforcing steel 9. Epoxy anchors 10. Expansion anchors 11. Carbon FRP ( Structural ) 12. Repairs in existing brick walls 13. Catwalk rod support system. S5. Provide Code Analysis Data Sheet for each building, minimum of ( 3 ) three on this Project, III-A building, II-A building, and New Structure, explain. S6. Clearly show Occupancies and Types of Construction, on drawings. S7. Provide accessibility to/for dressing rooms, ref IBC sec 11 and 3408.5. S8. Clarify lean-to Construction Type, Exterior Wall Fire Rating and Roof Fire Rating at Electrical Room. S9. Provide structural design and details for the Ejector Pit, ref A4.5. S10. Fully dimension and detail accessibile toilet rooms per IBC Chapter 11 and ANSI A117.1-1998 ed, ref A1.2, a1.9. S11. Clarify Roofig Classification on drawings. S12. Please provide two (2) copies of the Project Specifications for review. S13. Submit two (2) copies of Shop Drawings prior to erection for: 1. EIFS System 2. Grating 3. Railings 4. Stairs 5. Ladders 6. FRP System 7. Metal Decking 8. Trusses. |
12/19/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The ventilation rate for rooms 201 and 202 is more appropriately identified as "Theater - Lobby" with an occupant load of 150 people per 1000 square feet and 20 CFM per person. Reference Section 403.3, IMC 2000. 2. The ventilation rate for rooms 001 and 012 is more appropriately identified as "Offices - Reception Area", with an occupant load of 60 people per 1000 square feet and 15 CFM per person. Reference Section 403.3, IMC 2000. 3. The ventilation rate for room 103 is more appropriately identified as "Theater - Ticket Booths", with an occupant load of 60 people per 1000 square feet and 20 CFM per person. Reference Section 403.3, IMC 2000. 4. Refer to Section 403.3.2 of the 2000 IMC to determine the correct amount of ventilation for areas served by a common ventilation source but having different ventilation rates (e.g. AHU-1, FC-1, FC-9, FC-11, and FC-12). 5. Coordinate the amount of outside air scheduled for the air handling units and fan coil units on sheet M3.0 with the required amount of outside air shown on sheet M1.0. Reference Section 106.3.1, IMC 2000. 6. Provide duct smoke detector in return duct of AHU-1. Reference Section 606.2, IMC 2000. 7. Provide fire dampers for ducts from EF-2 and SF-1 at their penetration of the 2-hour party wall. Reference Section 607.5, IMC 2000. 8. Show how the OA duct from SF-2 complies with Section 607.6, IMC 2000, at the penetration of the 3-hour floor/ceiling. 9. Provide supplemental restraints for the spring isolators for chiller and air handling units. Reference Section 301.10, IMC 2000. 10. Provide pipe supports at intervals complying with Section 305.4, IMC 2000. 11. Show that the pipe penetrations of fire-rated walls comply with Section 711.3, IBC 2000. 12. Show how the hydronic system is to be drained. Reference Section 1206.2, IMC 2000. 13. Show how the overflow drains on the fan coil units (Note 3, Fan Coil Schedule, M3.0) are to be routed and terminated. Reference Section 307.2.3, IMC 2000. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/09/2004 | TAMI ACHONG | OUT TO CUSTOMER | Completed |
01/09/2004 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |