Permit Review Detail
Review Status: Completed
Review Details: REVISION - - 4TH
Permit Number - T03CM05695
Review Name: REVISION - - 4TH
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/30/2006 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | The pressure and flow data for the pipe organ provided by the architect (2800 CFM @ 1 PSIG) exceeds the rating of the fire damper for dynamic closure. Revise the design for the protection of the 14" duct penetrations as required to accommodate the actual operating conditions. |
03/30/2006 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the size of the water piping in Detail 4/P2.2 and Detail 2/P2.3 to correspond to sizes based on the calculations for Congress Street piping. 2. The cleanouts located downstream of the backwater valves shown on detail 1/P2.2 appear to be in violation of Section 707.6, UPC 1994. 3. Coordinate detail 3/P2.2 with the plumbing plan (i.e. what is fixture P2?). 4. Fixture K-34, located at the balcony level, requires a trap for the directly connected sink compartments. Reference Section 1011.8, UPC 1994 (currently approved grease traps do not have the required trap depth due to the presence of an air relief). 5. Commercial sinks such as K-34 require a 2"waste, not 1-1/2". Reference Table 7-3, UPC 1994. |
04/11/2006 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
04/11/2006 | DOUG LAAKSO | BUILDING-COMMERCIAL | REVIEW | Denied | S1. Provide construction details for installation of rigid insulation and stucco at equipment platform, ref drawing A1.0b, delta #3, including materials of construction and fastening to structure. S2. Provide construction details for delta #10, ref drawing A1.2, including materials of construction and fastening to comply with fire-rating and connection to structure. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/14/2006 | ADRIANNE OLIVO | OUT TO CUSTOMER | Completed |
04/14/2006 | SUE REEVES | REJECT SHELF | Approved |