Permit Number: T03CM04948
Parcel: 115160320

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T03CM04948
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/15/2003 JIM EGAN FIRE REVIEW Approved
10/15/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Approved
10/15/2003 RAUL PALMA BUILDING-COMMERCIAL REVIEW Approved
10/15/2003 ROBERT SHERRY WATER REVIEW Approved
10/15/2003 MICHAEL ST. PAUL ZONING REVIEW Approved
10/15/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Approved
10/15/2003 PATRICIA GILBERT ENGINEERING REVIEW Approved
10/16/2003 MELISSA POULIN WWM REVIEW Approved
10/16/2003 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Approved DENIED 10/16/03 T03CM04948
1. Since the work is being done to the circuits on Panel A, this is the schedule that shall be on the plans.
2. If the work is indeed to be done on the Panel indicated on the schedule for Panel C, the load calculation for the high phase needs to be rechecked. Connected VA per phase appears to be 5715, such that, when totalled, the current is 55.5, not 44.2 amps, over a 10 amp difference for this panel.
3. Bus amps for this panel are shown as 150 on the Panel Schedule, but 110 amp on the Line Diagram. Please clarify.
4. Panel Schedule indicates that the main is fused. Specify the fusing, and check that this is not a circuit breaker instead of a fuse.
5. Line Diagram indicates that the Panel has a 50 A Main Circuit Breaker. If this is the case, this would consist of an overload per Comment #2 above.

Final Status

Task End Date Reviewer's Name Type of Review Description
10/16/2003 TAMI ACHONG OUT TO CUSTOMER Completed