Permit Review Detail
Review Status: Completed
Review Details: REVISION - WALK THRU
Permit Number - T03CM03908
Review Name: REVISION - WALK THRU
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/11/2005 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Revise the dishwasher drain from direct to indirect waste. 2. Route the rinse sink to the grease trap. 3. Provide flow control devices for the rinse sink and the 2-compartment sink. The flow control devices shall be readily accessible. 4. Provide a terminal cleanout for the floor sink located under the steam tables. (All fixtures having a horizontal drain, 5 feet or longer, require a cleanout. Sinks and urinals require a cleanout if they have any horizontal drain piping.) 5. A backwater valve is installed in a building sewer, not a backflow preventer. 6. Show a vent for all fixture traps (e.g. the shower). |