Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Completed
Review Details: RESUBMITTAL
Permit Number - T03CM03284
Review Name: RESUBMITTAL
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/05/2003 | Robert Sherry | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. The calculations provided on this submittal indicate that the common ventilation system provided by AC-1 is not sized in accordance with Section 403.3.2, IMC 2000. 2. Show the type of secondary drain system to be provided for the fan coil units. Reference Section 307.2.3 IMC. 3. The return air for room 106 and (Shipping and Receiving) is set for 470 CFM while the supply air is called out as 600 CFM. Show how this conforms to the requirements of Section 403.1, IMC 2000. 4. The energy code compliance reports indicate the town of Pima has been used as a basis for calculations; use Tucson. Second request. 5. Provide heating and cooling load calculations used to size the HVAC equipment. Reference Section 703.2, IECC 1998. Second request. |
| 09/05/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide site drawing showing the size of both the water meter and the reduced pressure backflow preventer assembly. Reference Section 302.3, Uniform Administrative Code 1997 and Section 610.2, UPC 1994. 2. Coordinate the size and location of the water supply shown on the site plans with the plumbing plans. Coordinate the location of the building sewer shown on the site plans with the plumbing plans. 3. Show the slope of the building sewer on the site drawing. Reference Section 718.1, UPC 1994. 4. Provide rim elevation of next upstream sanitary manhole and first floor elevation. Determine need for backwater valve per Section 710.1, UPC 1994. Second request. 5. The cold water pipe sizes shown on detail 2/P-1.1 and the plumbing plan are undersized based on the your supplied calculations. At 5.33 PSI/100ft, a ½" pipe can handle only 2 fixture units and a ¾ pipe can handle only 8 fixture units. |
| 09/08/2003 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 09/16/2003 | Martin Haeberle | BUILDING-COMMERCIAL | REVIEW | Approv-Cond | |
| 09/24/2003 | MICHAEL ST. PAUL | ZONING | REVIEW | Denied | Site plan approval and building approval required. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/30/2003 | DELMA ROBEY | OUT TO CUSTOMER | Completed |