| 08/29/2003 | Robert Sherry | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide exhaust for clothes dryers. |
| 08/29/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Install expansion tank for water heater on cold water piping, in accordance with its listing. Reference Section 310.1, UPC 1994. 2. Provide combustion and relief air for water heaters. Reference Section 507.3.1, UPC 1994, as amended by the State of Arizona. 3. Coordinate layout of building sewers shown on sheet SP-1 with the layout shown on sheet A-6. 4. Coordinate the waste riser diagram on sheet A-6 with the plumbing plan on the same sheet. 5. Provide vents for the floor drains. Reference Section 901.0, UPC 1994. 6. Limit the length of the trap arms for the kitchen sinks to 5'-0". Reference Section 1002.2, UPC 1994. 7. A cleanout is not required on the kitchen sink trap arms but a cleanout is required for the horizontal drainage pipe from the kitchen sink trap arm to the main building drain. Reference Section 707.4, UPC 1994. 8. Clarify the configuration of the building drain between Unit 1 and Unit 2 near the water closets. 9. Modify the connection of the horizontal drainage lines between Unit 2 and Unit 3 to comply with the requirements of Section 706.3, UPC 1994. 10. Provide fixture descriptions for all plumbing fixtures. 11. Recalculate plumbing schedule using the values shown on Tables 6-3 and 7-3, UPC 1994. 12. Provide water calculations to document that the pipe sizing for the total project is in compliance with Section 610.4, UPC 1994. The total developed length for the water piping shall be measured from the water meter to the most remote outlet. Include the size of the water meter on the plans. 13. Provide riser diagram for water. 14. Provide a Type B vent for the water heaters. Reference Section 502.12 (2), UPC 1994. |
| 08/29/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 09/02/2003 | Blanca Espino | ENGINEERING | REVIEW | Denied | An approved Site Plan required. |
| 09/10/2003 | Martin Haeberle | BUILDING-COMMERCIAL | REVIEW | Denied | 1. Provide a complete lateral analysis for the entire structure. Include wind-load components and cladding design. Reference sections 1603 & 1604 IBC. 2. Include earthquake design data within calculations. Reference section 1603.1.5 IBC 3. Provide deflection calculation for wood diaphragms. Reference sections 2305.2, 2305.2.5, and figures 2305.2.5(1&2) 4. Please clarify cantilevered joist diaphragm calculations, include detail on plans. 5. Provide truss calculations for this project. 6. Specify on plans wood species to be used per calculations. 7. Provide glulam species and type 8. A complete framing plan is required 9. Foundation plan to reflect hold-down locations per calculations. 10. Detail H does not reflect criteria as shown on foundation plan. (note offset footing) 11. Calculation for all bearing foundations and columns is required. 12. Carports enclosed on more than two sides are classified as a garage. Revise plans to reflect criteria for a garage/dwelling fire separation. See sheet A-1. Reference section 406.1.3 IBC 13. A detail of the one-hour fire barriers is required, show drop ceiling and fire blocking in detail as well. Reference section 708.1 IBC. 14. Note on plans the listing used for the fire barriers. 15. Indicate on plan method and listing of opening protection for penetrations of the fire barriers. Reference section 714 IBC 16. Provide attic ventilation calculations and show on plans how it is to be achieved. Reference section 1202.2 IBC |
| 09/11/2003 | MELISSA POULIN | WWM | REVIEW | Denied | Needs WWM review of jt use on sewer easement |
| 09/12/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 09/23/2003 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. 1. Bathroom branch circuits shall comply with NEC 210-11 (c) (3). Such circuits shall have no other outlets, whereas Circuits 16 and 18 each have outlets in the bedrooms as well as in the bathrooms. 2. Bathroom branch circuits shall comply with NEC 210-11 (c) (3), which calls 20-ampere bathroom branch circuits. Circuits 16 and 18 are 15-ampere. 3. Install receptacles on wall on north side of living room per NEC 210-52 (a) (1). 4. According to the Legend, the dryer is on a 110-volt receptacle. According the circuiting (6,8) power requirements are for 240-volt. Please clarify. 5. According to Sheet A-7, the HVAC Unit takes a 45A circuit breaker. Yet the panel schedule indicates 50A CB. If the unit takes a MAX CB of 45A, we cannot go over this value. Please clarify. 6. Specify conductor type for branch circuits. 7. Specify conduit size and type for branch circuits and panel feeders. 8. Ampacity of 2/0 Aluminum is 135, per Table 310-16, 75ÂșC column. Such conductor is not protected by a 150A CB. 9. Arrowhead for 2" conduit to subpanel points to the Grounding Electrode Conductor. Please correct. 10. Provide sizing for the Grounding Electrode Conductor and the Branch Circuit Equipment Grounding Conductors. |
| 10/03/2003 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 10/3/2003 Building plans may not be reviewed and approved until the site and landscaping plans are approved. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/06/2003 | TAMI ACHONG | OUT TO CUSTOMER | Completed |