Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T03CM01900
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/14/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
| 07/14/2003 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
| 07/14/2003 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | SCOPE OF REVIEW: The scope of this second review covers Architectural, Structural, Plumbing, Mechanical and Electrical. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. CIVIL: · Previous Comment: Sheet C2: Provide copy of listing for storm drain pipe documenting that this material is approved for use under buildings. Still Required: No documentation was received substantiating that proposed materials or existing materials are listed for use under a building. ARCHITECTURAL: · Previous Comment: Sheet RS1: Provide a description of the use of the existing bottling operations and the use of the addition to substantiate the F-2 occupancy classification. Processes using cans or glass bottles would be within the scope of F-2. Processes using combustible packaging such as plastic bottles would be an F-1 occupancy. It appears that the addition is for an S-1 storage occupancy, not an F. Using F-1 & S-1 classifications will not affect the allowable area. It will shorten the maximum egress travel distance allowed to 250' but addition appears to comply. Still Required: Warehousing is an S occupancy. S-1 includes plastic bottles. The building occupancy classification is a mixed used of F-2, B and S-1. Revise plans accordingly. -End of Review- |
| 07/14/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
| 07/14/2003 | EROSE1 | WATER | REVIEW | Needs Review | |
| 07/14/2003 | EROSE1 | FIRE | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/14/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |