Permit Review Detail
Review Status: Completed
Review Details: 3RD PARTY REVIEW-COMMERCIAL TI
Permit Number - T03CM01900
Review Name: 3RD PARTY REVIEW-COMMERCIAL TI
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/06/2003 | EROSE1 | WWM | REVIEW | Needs Review | |
| 06/06/2003 | EROSE1 | ENGINEERING | REVIEW | Needs Review | |
| 06/06/2003 | STANTEC | 3RD PARTY REVIEW-COMMERCIAL | REVIEW | Denied | SCOPE OF REVIEW: The scope of this second review covers Architectural, Structural, Plumbing, Mechanical and Electrical. All features were checked only to the extent allowed by the submittal provided. All portions of the project are assumed to meet or will meet other departmental requirements, conditions and concerns before permit approval. GENERAL: q Previous Comment: Remove the 'preliminary not for construction' stamps from the plan sheets. Still Required: Do not find note on plan sheets indicating sheets are 'reference only'. q Previous Comment: Plans indicate the addition is proposed to be constructed over utility and drainage easements. Provide documentation that these easements have been abandoned or that the City and each authorized user has approved the encroachment into the easements. Still Required: Easements are still noted and no documentation of abandonment has been received. CIVIL: q Previous Comment: Sheet C2: Provide copy of listing for CPE drain pipe documenting that this material is approved for use under buildings. Still Required: Plan still indicates "CPE". No documentation was received substantiating that proposed materials or existing materials are listed for use under a building. ARCHITECTURAL: q Previous Comment: Sheet RS1: Provide a description of the use of the existing bottling operations and the use of the addition to substantiate the F-2 occupancy classification. Processes using cans or glass bottles would be within the scope of F-2. Processes using combustible packaging such as plastic bottles would be an F-1 occupancy. It appears that the addition is for an S-1 storage occupancy, not an F. Using F-1 & S-1 classifications will not affect the allowable area. It will shorten the maximum egress travel distance allowed to 250' but addition appears to comply. Still Required: Warehousing is an S occupancy. S-1 includes plastic bottles. The building occupancy classification is a mixed used of F-2, B and S-1. Revise plans accordingly. q Previous Comment: Sheet A2: Provide specifications for sky lights indicating they are to be listed and have an ICBO or NER report # as evidence of compliance with IBC requirements. Noted: To be included in the deferred submittal for the metal building package. q Previous Comment: Sheet A5 et. al: Specify the flame spread and smoke development rating of the vinyl faced building insulation as it is not indicated in the project manual. Noted: To be included in the deferred submittal for the metal building package. q Previous Comment: Sheet A2: Provide detailed design of roof drainage system including the overflow drainage system. Specify the slope of gutters in compliance with UPC requirements. Over flow scuppers shall be three times the size required for a roof drain. Provide design of gutters including joining system listed for condition of being an integral part of the building. Sheet A11 refers to the plumbing plans, but not design is provided on the plumbing plans. Noted: To be included in the deferred submittal for the metal building package. STRUCTURAL: q Previous Comment:A special inspection form is required for the following: · Concrete · Bolts in Concrete · Reinforcing Steel · Welding · Drilled Piles and Caissons · Epoxy Anchors Still Required: Form has not been signed by the owner or legal agent nor has contractor been designated. q Previous Comment: Sheet S1: Metal building design plans and calculations can not be deferred. The lateral forces resisting system of the building cannot be verified as stated in CTS calculations. Noted: To be included in the deferred submittal for the metal building package. q Previous Comment: Ledger L1 is shown on the roof framing plan but no schedule is provided. Noted: To be included in the deferred submittal for the metal building package. q Previous Comment: How is a small section of the building laterally braced in e/w direction along gridline D? Noted: To be included in the deferred submittal for the metal building package. q Previous Comment: What would be a diaphragm chord at gridlines 1 and 4? If L1 is to be a chord, some provision panel/steel structural differential movement shouls be provided. Detail 201 shows solid embed plates @ 48" o.c. No other info is provided, The same situation occurs at gridline K per detail 202. Noted: To be included in the deferred submittal for the metal building package. MECHANICAL: q There are no mechanical comments to be addressed. PLUMBING: q There are no plumbing comments to be addressed. ELECTRICAL: q There are no electrical comments to be addressed |
| 06/06/2003 | ELAINE ROSE | ZONING | REVIEW | Needs Review | |
| 06/06/2003 | EROSE1 | WATER | REVIEW | Needs Review | |
| 06/06/2003 | EROSE1 | FIRE | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/06/2003 | ELAINE ROSE | OUT TO CUSTOMER | Completed |