Permit Review Detail
Review Status: Completed
Review Details: COMMERCIAL NEW
Permit Number - T03CM01875
Review Name: COMMERCIAL NEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/09/2003 | JIM EGAN | FIRE | REVIEW | Approved | |
| 05/09/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Correct scale of plumbing site plan, 1/P1.0BN. Reference Section 302.3, Uniform Administrative Code, 1994. 2. Resize the RPBP and the water meter to comply to Section 610.2, UPC 1994. 3. Correct installation of P-2 and P-3 to conform to Section 908.1, UPC, 1994. 4. Termination of the excess pressure relief from the water heater over a mop sink is not approved location. Reference Section 608.5, UPC, 1994. 5. Provide vent piping of sufficient size to comply with Section 904.1, UPC. 6. Provide calculations and sizes of scuppers and downspouts. Reference Appendix D, UPC. |
| 05/09/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Coordinate the exhaust volume scheduled for EF-3 with the exhaust volumes shown on the floor plan. |
| 05/09/2003 | ROBERT SHERRY | WATER | REVIEW | Approved | |
| 05/20/2003 | PATRICIA GEHLEN | ZONING | REVIEW | Denied | Zoning 5/20/2003 A yellow card and site plan are required for handi-cap review and approval prior to building plan approval. All new structures and parking must be ADA compliant. |
| 05/28/2003 | GERRY KOZIOL | WWM | REVIEW | Approved | |
| 06/03/2003 | MARTIN HAEBERLE | BUILDING-COMMERCIAL | REVIEW | Denied | 1. MPR does not reflect the required fixtures per Table 2902.1 IBC. Note: A total fixture count and occupant load of the school may be used if the total is in compliance with Table 2902.1 IBC. 2. Provide occupant loads on the plans for the MPR building. Note, a 7 net ratio is to be used for the assembly area. Reference Table 1003.2.2.2 IBC 3. The urinal is to be accessible per section 1108.2 IBC 4. Weep screed is not shown on plans for the stucco system. Reference section 2512.1.2 IBC. Revise plans 5. Overflow for the roof leader appears to be undersized. Provide calculations for sizing of overflow. 6. Ceiling Plan shows lay-in tile and bathroom cross-section indicates drywall. Please clarify. Note attic ventilation required if drywall. |
| 06/05/2003 | LINDA BUCZYNSKI | ELECTRICAL-COMMERCIAL | REVIEW | Approved | |
| 06/05/2003 | DOUG WILLIAMS | ENGINEERING | REVIEW | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 06/12/2003 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |
| 06/06/2003 | ANGIE SHOFFSTALL | REJECT SHELF | Completed |