Permit Review Detail
Review Status: Completed
Review Details: REVISION
Permit Number - T03CM00901
Review Name: REVISION
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/07/2003 | ROBERT SHERRY | MECHANICAL-COMMERCIAL | REVIEW | Denied | 1. Provide clarification of normal ventilation of compressor room (146). Reference Section1105.6.3 2. Provide refrigerant detectors for the compressor room. Reference Section 1105.5. |
| 10/07/2003 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Denied | 1. Provide information to show that the hub drain (FD-3, Detail 19/P10) complies with Section 410.1, UPC 1994. 2. Revise the combination waste and vent system in the area of columns J8 - K9 to comply with the requirements of Section 910.0, UPC 1994. Provide riser diagram to clearly show the design. 3. Provide upper terminal cleanouts on horizontal drainage pipe near column L.5-6. Reference Section 707.4, UPC 1994. 4. Provide information to verify that none of the compartments in the three-compartment sink will be required to have an indirect waste due to Health Department requirements. Reference Section 801.2, UPC 1994. 5. Provide flow control device for three-compartment sink. Reference Section 1011.3, UPC 1994. |
| 10/20/2003 | Linda Buczynski | ELECTRICAL-COMMERCIAL | REVIEW | Denied | TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL. PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US IF YOU CARE TO DISCUSS. GLOBAL PLANS NEED TO BE DATED AS WELL AS SEALED AND SIGNED BY REGISTRANT. DATE SEALED, SIGNED PLANS, ALL SHEETS!! Sheet E1 1. Show fault calculations and AFC at secondary of T-3. Demonstrate that LP-12 and LP-13 are properly rated at 10,000 RMS (IER). 2. Show fault calculations and AFC at CU-1A AND CU-1B. Sheet E4 1. CU-1B has been added since plans were originally approved. Either document as part of this Revision or remove from plans. Sheet E4 2. There is new work in Rooms 170 and 171, added since plans were originally approved. Either document as part of this Revision or remove from plans. Sheet E6 1. Show Revision Documentation for Revision 4 on bottom of Sheet. Sheet E8C 1. Provide a disconnect for the Evap Coil Cooler. 3. LP-12, 25 powers Control Cabinet #3 on the Rm 146 Power Plan. Panel Schedule indicates this circuit is a spare. Please clarify. Sheet E10B 1. Phase B overloaded Panel LP-10A. 128.3 > 100. 2. Panel PL-13 has some Freezers with fans, lights, and anti-sweat heater, some with 2 heaters, fans, but no lights, some with two heaters, lights, but no fan. Please verify that such is the intent. 3. Panel LP-10, Circuit 40, allocated for both the Undercounter Freezer and the Refrigerized Merchandise Case. See Sheet E-8. Load calc on Panel appears to consider only the UC Freezer. Please revisit intent. 4. PL-13, 30 has 5.1 KVA but no load. Please clarify. 5. PL-13 is unbalanced but not overloaded. Just an observation. Sheet E16 1. Show mounting detail for new Transformer T-3. Include weight of this transformer. |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/21/2003 | CINDY AGUILAR | APPROVAL SHELF | Completed |
| 10/21/2003 | CINDY AGUILAR | OUT TO CUSTOMER | Completed |