Review Status: Completed

Review Details: REVISION - GRADING

Permit Number - T03BU01937
Review Name: REVISION - GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/13/2009 ELIZABETH LEIBOLD ENGINEERING REVIEW Approved SUBJECT: Revised Grading Plan As-built for Close-Out Assistance Resubmittal Engineering Review
SUBDIVISION: Starr Pass Heights
PROJECT ADDRESS: 1401 South San Antonio Drive
ACTIVITY #: (S02-046, T05OT00280) T03BU01937-R2

SUMMARY: Final Revised Grading Plan sheets for Starr Pass Heights Subdivision Close-out were received by Engineering on August 12, 2009. Planning & Development Services Department Engineering Division recommends approval of the grading permit for closure as long as the following documentation is submitted per the following conditions to the grading permit.

GRADING PERMIT CONDITIONS:
The following conditions apply to grading permit T03BU01937- R2:
1) Any remaining improvements or remediation required for the SCZ area shall be completed to the satisfaction of DSD Landscaping.
2) Submit 2 copies of the following closure documentation letters:
a) Copies of the geotechnical field reports or a final geotechnical conformance letter stating geotechnical constraints were met with regard to this project and in particular: the addenda relating to the north slope, and the fill for the glass bottle dump area. Geotechnical Statement is required to be submitted stating that the recommendations of the Geotechnical Engineer has been followed for earthwork near lots 56-62 and 112 and 114; see Geotechnical Subsurface Evaluation prepared by GRC Consultants Inc (Dated 12-15-03).
b) A copy of a drainage letter stating that the final project for Starr Pass Heights conforms to the drainage design of approved plans and reports and in particular the drainage statement / addenda as well as City drainage regulations.
c) A copy of a drainage letter that states the Starr Pass Heights basins function to City standards with regard to function and drain-down time. If there were any previous punchlist items that required post construction percolation test results, also submit those documents.
d) A copy of a substantial completion letter by current engineer for Starr Pass Heights project stating that the project substantially conforms to approved plans and approved revised grading plans.
3) A copy of the submitted plans will be forwarded to the Engineering Inspectors at this time for their final inspection.

For questions, call me at 837-4934.

Elizabeth Leibold, PE
Civil Engineer
Engineering Division
Development Services Department
08/13/2009 MICHAEL ST. PAUL ZONING REVIEW Approved
08/17/2009 PETER MCLAUGHLIN NPPO REVIEW Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/25/2009 SUE REEVES APPROVAL SHELF Completed
09/25/2009 CPIERCE1 OUT TO CUSTOMER Completed