Permit Number: T02CM05550
Parcel: 134220030

Address:
6606 E LEHIGH DR

Review Status: Completed

Review Details: COMMERCIAL TI

Permit Number - T02CM05550
Review Name: COMMERCIAL TI
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/10/2003 ROBERT SHERRY WATER REVIEW Approved
03/10/2003 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied 1. Recalculate plumbing fixture schedule (Sheet 2MP1) using the values shown on Tables 7-3 and A-2, UPC.
2. Confirm the presence of cleanouts in the existing building sewer at intervals not exceeding 100 feet. Reference Section 719.1, UPC 1994.
3. Indicate the inverts of the new building sewer at its points of connection to the existing building sewer as well as its minimum slope. Reference Sections 718.1 and 718.3, UPC 1994.
4. Provide rim elevation of the next upstream manhole and the floor elevation of the building to confirm compliance with Section 710.1, UPC 1994.
5. Correct size of fire department connection. Reference Section 4-15.2.2, NFPA 13.
6. Provide detail of water heater installation, including excess pressure relief, expansion tank, and valves. Reference Section 302.3, Uniform Administrative Code 1994.
7. Confirm that suspended water heater complies with access requirements of Section 511.0, UPC 1994.
8. Clarify the call outs for the water hammer arrestors currently shown as "WH-1" on floor plan and "WHA" on riser diagram.
9. Provide cleanouts at P-2 fixtures. Reference Section 707.4 (1), UPC 1994.
10. Provide water shut off valves as required in Section 605.1, UPC 1994.
11. Coordinate natural gas calculations with heating capacity of rooftop units on mechanical plans.
03/10/2003 ROBERT SHERRY MECHANICAL-COMMERCIAL REVIEW Denied 1. Provide minimum outside air quantity to multipurpose room per Table 403.3, IMC 2000 whenever the area is occupied. Additional outside air may be supplied as required to maintain the CO2 concentration as noted in the Sequence of Operation.
2. Coordinate mechanical components listed in Summary Compliance Report with equipment specified on drawings.
03/11/2003 JIM EGAN FIRE REVIEW Approved
03/18/2003 MARTIN HAEBERLE BUILDING-COMMERCIAL REVIEW Denied 1.A deferred submittal requires approval of the Building Official. Submit in writing a request for deferral of the metal building plans to the Building Official.
2. Provide location of the assumed property line between buildings or include allowable area calculations for adjacent structures. References section 704.3 IBC.
3. If assumed property line is to be used provide details for required fire protection. Reference Table 602 IBC
4. Provide existing and new buildings plumbing fixture count showing compliance with the total fixtures required per Table 2902.1 IBC.
5. Room 100 requires an one-hour fire barrier for separation from main use. References section 302.1 IBC. Revise plans
03/20/2003 GERRY KOZIOL WWM REVIEW Approved
03/26/2003 LINDA BUCZYNSKI ELECTRICAL-COMMERCIAL REVIEW Denied TRANSMIT ORIGINAL DRAWINGS WITH NEXT SUBMITTAL.

PLEASE CALL AT 791-5550 X1106 OR EMAIL AT LBUCZYN1@CI.TUCSON.AZ.US
IF YOU CARE TO DISCUSS.

1. Provide rooftop receptacles for AC-1 through AC-3. On Sheet 2M1 these units appear to have convenience outlets, but per NEC 210-63 these outlets shall not be connected to the load side of the equipment disconnecting means.
12/03/2002 JAMES TATE FLOODPLAIN REVIEW Approved
12/03/2002 DAVID RIVERA ZONING REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
03/27/2003 ELAINE ROSE OUT TO CUSTOMER Completed